Skip to main content
Save as PDF
Top Navigation
About PRISM and Project Search
Project Snapshot
PRISM Project #12-1306 (Completed)
Gold Creek Habitat Assessment + Conceptual Design
Collapse All
Project Details
Kittitas Conservation Trust; Gold Creek Habitat Assessment + Conceptual Design (#12-1306) , Progress Report: 12/23/2013 07/15/2013, Attachment #176598, Heli Pond staff gage
Project Status:
 
Closed Completed since 08/14/2015
Project Type:
 
Planning
Project Sponsor:
 
Kittitas Conservation Trust
Funding Board:
 
Salmon Recovery Funding Board
    Funding
 
Salmon State Projects:
$167,250
Total RCO Grant:
$167,250
(91%)
Sponsor Match:
$17,250
(9%)
Total Agreement:
$184,500
(100%)
    Links
 
Original Project Agreement
Amendments: 3
Final Report
Attachments: 93 files
Project Description
Kittitas Conservation Trust will use this planning grant to assess salmonid habitat in the Gold Creek watershed and produce a habitat restoration project conceptual design. Gold Creek is a head waters tributary to the upper Yakima River that originates in the Alpine Lakes Wilderness and then flows into Lake Keechelus near Snoqualmie Pass in northern Kittitas County (WRIA 39). The primary goal of the assessment is to investigate the causes of Bull Trout mortality such as seasonal dewatering, spatial constraints and habitat degradation, then design restoration actions that employ natural fluvial processes to reverse the decline in population. Bull trout were listed as Threatened under the Endangered Species Act in 1998.
The Gold Creek Bull Trout population became geographically isolated after completion of the Lake Keechelus Dam in 1917 and is designated as a high priority Action population in the Yakima Bull Trout Action Plan. The Plan identifies channel dewatering, low abundance, and passage barriers at Keechelus Dam as the primary factors for population decline. Conceptual engineering plans for restoration actions will be derived from this comprehensive hydrological, geomorphic and biological habitat assessment. The project will also benefit anadromous fish populations in the upper Yakima basin when passage at Keechelus Dam is restored.
Project Contacts
Project Sponsor:
Kittitas Conservation Trust
Lead Entity:
Yakima Basin Fish and Wildlife Recovery Board Lead Entity
Project Contact:
David Gerth
(509) 649-2951
Funding Agency:
Recreation and Conservation Office
Project Manager:
Elizabeth Butler
elizabeth.butler@rco.wa.gov
(360) 867-8650
Project Location
General Area:
The Gold Creek watershed - from where it originates in the Alpine Lakes Wilderness near Snoqualmie Pass southerly through the Wenatchee National Forest and other private parcels, under Interstate-90 and into Lake Keechelus in Township 22N, Range 11E. nort
County:
Kittitas
Legislative District:
13
Congressional District 2022:
08
Salmon Recovery Regions:
Middle Columbia River
Watershed Administrative Unit:
Keechelus
HUC8:
Upper Yakima (17030001)
WRIA:
Upper Yakima
Sections:
15
Township:
T22NR11E
Coordinates:
47.39740970
-121.38199148
Worksites
Worksite Name
Scope of Work
Actual Planning Cost
Gold Creek (#1)
Conducting habitat restoration scoping and feasibility studies (B.1.b.8), Instream survey (B.2.c)
$193,548
Total
$193,548
Amounts may not be complete
Properties
Worksite Name
Property Name
Landowner Type
Gold Creek (#1)
Property 1 - Gold Creek - Forest Service
Federal Government
Gold Creek (#1)
Property 2 - Gold Creek - SkiTur Assoc.
Private
Gold Creek (#1)
Property 3 - Gold Creek - Forterra
Private
Total
Amounts may not be complete
Project Metrics (Outcomes, Benefits)
Category / Work Type / Metric
Final
Restoration Metrics (rolled up from Worksite level)
Area Encompassed (acres) (B.0.b.1)
188.0
Salmonid Habitat Assessment / Inventory
Instream survey (B.2.c)
Stream Miles Assessed (B.2.c.2)
3.00
Stream miles assessed that contained salmonids (B.2.c.3)
3.00
Stream Miles Assessed That Needed Restoration (B.2.c.4)
3.00
Miles of Stream and/or Shoreline Affected (B.0.b.2)
3.00
Project Milestones
Milestone Name
Target Date
Description
Project Start
12/06/2012
Data Gathering Started
02/01/2013
RFP Complete/Consultant Hired
03/01/2013
RFQ released 12/15/12 to 17 habitat consultants, responses due back to KCT on 1/16/13.
Special Conditions Met
05/01/2013
Assessment design and scope complete (includes project plan, itemized tasks and schedule)
Progress Report Due
06/01/2013
Cultural Resources Complete
06/30/2013
RCO completed consultation through EO-05-05. NO SURVEY REQUIRED
Special Conditions Met
07/01/2013
Hydrologic monitoring devices deployed
Annual Project Billing Due
07/31/2013
and at least once per year, thereafter
Draft Plan to RCO
12/01/2013
Preliminary Habitat Analysis Report
Special Conditions Met
12/01/2013
Data gap analysis complete
Progress Report Due
12/31/2013
Annual Project Billing Due
12/31/2013
including backup documents
Progress Report Due
03/31/2014
Cultural Resources Complete
03/31/2014
RCO to complete consultation on additional work through EO-05-05. NEW WELLS ARE ADJACENT TO EXISTING WELLS (already consulted for wells in that location). NO ADDITIONAL CONSULTATION NEEDED.
Annual Project Billing Due
03/31/2014
including backup documents
Progress Report Due
06/30/2014
Annual Project Billing Due
06/30/2014
including backup documents
Progress Report Due
09/30/2014
Draft Plan to RCO
11/01/2014
Draft Habitat Analysis and Conceptual Restoration Designs (Technical Work Group and stakeholder presentations)
Progress Report Due
12/31/2014
Draft Plan to RCO
01/31/2015
Hydrologic Monitoring Report to RCO
Special Conditions Met
03/01/2015
Restoration Design Alternative Review (Technical Work Group Presentations)
Progress Report Due
03/31/2015
Final Plan to RCO
06/01/2015
Feasibility Study Deliverables and Conceptual Restoration Designs
Final Plan to RCO
06/01/2015
Hydrologic Monitoring & Geomorphic Report to RCO
Final Report Due
06/30/2015
Agreement End Date
06/30/2015
PROJECT CLOSING. All expenditures must be prior to this date.
Annual Project Billing Due
06/30/2015
including backup documents
Final Billing Due
08/01/2015
including backup documents
Project Attachments
Attachment Type
Attachment Title
Attach Date
Agreement - State
12-1306 Project Agreement.pdf
05/09/2014
Agreements - Special
2014 Ecology-RCO contract 15-05.pdf
03/29/2017
Amendment - State
amendments to 2014 Ecology-RCO contract 15-05.pdf
03/29/2017
Amendment - State
Time Ext - Amendment #2.pdf
07/31/2015
Amendment - State
Cost Change- Amendment #1.pdf
07/31/2015
Amendment - State
12-1306 Amend #3 Cost Change.pdf
08/01/2014
Amendment request
Ecology Grant Amendment to project 081513.docx
09/09/2013
Correspondence
05112015_Ski_Tur_Comments_from_Site_Visit.pdf
07/31/2015
Correspondence
USFWS Support letter.pdf
06/29/2014
Correspondence
Gold Creek Pond Experiment Design NSD 061214.pdf
06/29/2014
Correspondence
Ecology GRANT Announcement.pdf
09/09/2013
Correspondence
12-1306 no cult res survey .pdf
03/19/2013
Correspondence
Landownership Certification123112.pdf
12/31/2012
Correspondence
Response to Review Panel Comments 090112.docx
09/03/2012
Correspondence
Halupka-letter of_ support_GC_070312.pdf
07/03/2012
Correspondence
BullTrout ActionPlan Gold Creek cite.pdf
05/09/2012
Cost Estimate
Cost Estimate Gold Creek 050212.xls
05/07/2012
Design document
DRAFT Gold Creek Concept Figures.pdf
04/06/2015
Design document
DRAFT Gold Creek Concept Memo 2-11-15.pdf
04/06/2015
Design document
LiDAR Report CE WSI 081712.pdf
09/04/2012
Environmental Clearance
USFS DecisionMemo-Signed-081214.pdf
09/29/2014
Environmental Clearance
HPA 2014-3-5+01_Gold_Cr-KCT-dam.pdf
09/29/2014
Environmental Site Assessment Report
Hydrology Figures-2 GC draft120513.pdf
12/20/2013
Environmental Site Assessment Report
Spawning Survey bull trout GC 111913.docx
12/20/2013
Environmental Site Assessment Report
Habitat Memo GC draft110513.docx
12/20/2013
Environmental Site Assessment Report
Hydraulic Profiles GC draft110513.xls
12/20/2013
Environmental Site Assessment Report
Hydrology memo GC draft120513.pdf
12/20/2013
Environmental Site Assessment Report
Data Inventory Memo GC 053113.pdf
12/20/2013
Final project report
Final Report 08/14/2015.pdf
08/14/2015
Map
MAP detail Gold Creek quad.pdf
05/07/2012
Map
Vicinity Map.pdf
05/07/2012
Map: Planning Area
Pond_Raising_Map_Experiment022414.pdf
03/21/2014
Map: Planning Area
Final_Monitoring_Locations 052013.pdf
05/28/2013
Map: Planning Area
Draft Monitoring Locations 041513.pdf
05/07/2013
News Article
03172015 TWG SecondDraft Invite.pdf
04/06/2015
Photo
Migrating bull trout.jpg
12/20/2013
Photo
Gold Creek dewater 082613.jpg
12/20/2013
Photo
Gold Creek dewater 072613.jpg
12/20/2013
Photo
Gold Creek inwater gage.jpg
12/20/2013
Photo
Heli Pond staff gage.jpg
12/20/2013
Photo
Gold Creek flow 052313.jpg
12/20/2013
Photo
Groundwater wellcap transducer.jpg
12/20/2013
Photo
Well Instllation 0072.jpg
12/20/2013
Photo
Gold Creek Pond WMeyer.jpg
05/09/2012
Photo
Lower Gold Creek W Meyer.jpg
05/09/2012
Photo
Gold Creek bull trout redds 2008 WMeyer.jpg
05/09/2012
Progress report
Progress Report 04/06/2015.pdf
04/06/2015
Progress report
Progress Report 01/30/2015.pdf
01/30/2015
Progress report
Progress Report 10/18/2014.pdf
10/18/2014
Progress report
Progress Report 07/03/2014.pdf
07/03/2014
Progress report
Progress Report 03/31/2014.pdf
03/31/2014
Progress report
Progress Report 12/24/2013.pdf
12/24/2013
Progress report
Progress Report 06/05/2013.pdf
06/05/2013
Project Deliverables
Restoration concepts rough cost estimate 022414.xlsx
08/11/2015
Project Deliverables
FINAL Concept Design Memo Figures.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Concept Design Memo.docx
05/18/2015
Project Deliverables
FINAL Gold Creek Geomorph Memo Figures - Part 3.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Geomorph Memo Figures - Part 2.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Geomorph Memo Figures - Part 1.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Geomorph Memo.docx
05/18/2015
Project Deliverables
FINAL Gold Creek 2014 Hydrology memo.docx
05/18/2015
Project Deliverables
FINAL Gold Creek 2013 Hydrology figures.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek 2013 Hydrology memo.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Habitat Memo Addendum.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Habitat Memo.pdf
05/18/2015
Project Deliverables
FINAL Gold Creek Data Memo.pdf
05/18/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 15.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 14.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 13.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 12.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 11.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 10.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 9.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 8.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 7.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 6.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 5.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 4.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 3.pdf
01/19/2015
Project Deliverables
Gold Creek DRAFT Geomorph Figures 1.pdf
01/19/2015
Project Deliverables
DRAFT Gold Creek Geomorph.docx
01/19/2015
Project Deliverables
DRAFT Gold Creek 2014 Hydorology memo figures (part 2).pdf
01/19/2015
Project Deliverables
DRAFT Gold Creek 2014 Hydorology memo figures (part 1).pdf
01/19/2015
Project Deliverables
DRAFT Gold Creek 2014 Hydrology memo.pdf
01/19/2015
Project partnership form
Proj Partner Contrib USFS $12k 062012.pdf
07/02/2012
Project partnership form
Proj Partner Contrib USFWS $10k 061912.pdf
07/02/2012
Project presentation
Project powerpoint presentation.ppt
07/02/2012
Project presentation
Stream Dewatering- Gold Creek.ppt
05/07/2012
Salmon Project Proposal
Project_Proposal 070312.pdf
07/02/2012
Scope of work
NSD Assessment Scope and Schedule 040313.pdf
05/28/2013
SRFB Review Panel Comment Form
Final review panel comment form.docx
04/16/2013
Visuals
Project location photos 052313.pdf
05/28/2013
Visuals
MAP Gold Creek landowners .pdf
05/07/2012
Back to top
Date of last change: 04/11/2024