PRISM Project #11-1553 (Completed)
Willow Creek daylighting
Collapse All
Project Details
Edmonds City of; Willow Creek daylighting (#11-1553) Attachment #118230, Edmonds_Marsh-aerial_photo
Project Status:
 
Closed Completed since 03/07/2014
Project Type:
 
Planning
Project Sponsor:
 
City of Edmonds
Funding Board:
 
Salmon Recovery Funding Board
    Funding
 
Puget Sound Acq. & Restoration:
$100,000
Total RCO Grant:
$100,000
(66%)
Sponsor Match:
$52,100
(34%)
Total Agreement:
$152,100
(100%)
    Links
 
Original Project Agreement
Amendments: 1
Final Report
Attachments: 37 files
Project Description
City of Edmonds will explore the feasibility of maximizing Chinook salmon rearing habitat in Edmonds Marsh through daylighting the connection between Willow Creek and Puget Sound. Edmonds Marsh is located within the City of Edmonds in the Central Puget Sound basin. The feasilibility report will a) evaluate the topography and hydrology of the marsh area to determine the potential for use by juvenile Chinook; b) analyze three options for daylighting Willow Creek; c) assess the hydrology of a restored marsh system that identifies the freshwater and saltwater hydrology signal, average water elevation, maximum and minimum water levels and hydroperiod during tidal fluctuations; and d) provide conceptual designs for the preferred alternative.
The evaluation of sediment accretion, erosion, and transport, and storm water inputs may be part of a later feasibility assessment phase.
Project Contacts
Project Sponsor:
City of Edmonds
Lead Entity:
Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Project Contact:
Jerry Shuster
JShuster@bellevuewa.gov
(425) 452-5206
Funding Agency:
Recreation and Conservation Office
Project Manager:
Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
Project Location
General Area:
Puget Sound, Edmonds
County:
Snohomish
Legislative District:
21
Congressional District 2022:
02
Salmon Recovery Regions:
Puget Sound
Watershed Administrative Unit:
Possession Sound-N Elliot Bay
HUC8:
Puget Sound (17110019)
WRIA:
Cedar - Sammamish
Sections:
26
Township:
T27NR03E
Coordinates:
47.80604785
-122.39087121
Worksites
Worksite Name
Scope of Work
Actual Planning Cost
Edmonds Marsh (#1)
Conducting habitat restoration scoping and feasibility studies (B.1.b.8), Habitat surveys (B.2.d), Landowner willingness inventory
$154,463
Total
$154,463
Amounts may not be complete
Properties
Worksite Name
Property Name
Landowner Type
Edmonds Marsh (#1)
Property 1 - Edmonds Marsh
Local Government
Total
Amounts may not be complete
Project Metrics (Outcomes, Benefits)
Category / Work Type / Metric
Final
Restoration Metrics (rolled up from Worksite level)
Area Encompassed (acres) (B.0.b.1)
26.6
Salmonid Habitat Assessment / Inventory
Habitat surveys (B.2.d)
Acres of habitat assessed (B.2.d.2)
26.0
Landowner willingness inventory
Number of landowers contacted
1
Project Milestones
Milestone Name
Target Date
Description
Project Start
12/08/2011
Data Gathering Started
12/08/2011
Collecting existing reports; identifying data gaps. See eligible pre-ageement expenses per Manual 18 (2011) page 65.
RFP Complete/Consultant Hired
07/19/2012
Annual Project Billing Due
07/31/2012
Required by this date.
Progress Report Due
08/08/2012
Progress Report Due
03/31/2013
Draft Design to RCO
04/12/2013
(was 2/2013) Draft Conceptual Design as described in Appendix D Manual 18 (2012)
Draft Plan to RCO
04/12/2013
(was dec-2012) Draft Feasibility Study as described in Appendix D Manual 18 (2012).
Annual Project Billing Due
07/31/2013
Progress Report Due
08/01/2013
Final Design to RCO
08/31/2013
Final Conceptual Designs as described in Appendix D Manual 18 (2012)
Final Plan to RCO
08/31/2013
Final Feasibility Study as described in Appendix D Manual 18 (2012)
Final Report Due
12/31/2013
Agreement End Date
12/31/2013
PROJECT CLOSING. This is the latest project end date possible for this design project. All expenditures must be prior to this date.
Final Billing Due
02/28/2014
Provide your final invoice and report within 60 days of Agreement End Date.
Project Attachments
Attachment Type
Attachment Title
Attach Date
Agreement - State
11-1553 Agreement.pdf
04/03/2012
Amendment - State
11-1553-amend1-sponsor change.pdf
07/05/2019
Amendment - State
11-1553-amend1-internal.pdf
07/05/2019
Amendment request
11-1553_WillowCreekDaylighting_sponsor_change_request_10-12-.pdf
10/12/2012
Billing forms
Billings.pdf
07/05/2019
Cost Estimate
FINALCostEstimates-ProjectBudget.xlsx
08/25/2011
Design document
ConceptualDesign_ProposedConditionsMap-EdmondsMarsh.pdf
03/22/2013
Final project report
Final Report 03/07/2014.pdf
03/07/2014
Inspection Report
Early App Site Visit Photos 06-08-11.pptx
07/27/2011
Landowner acknowledgement form
WillowCreek_CityofEdmonds-LandownerAcknowForm.doc
05/20/2011
Map
ExistingConditionsMap_EdmondsMarsh.pdf
03/22/2013
Map
Willow Creek historic 1870s T sheet.pdf
11/18/2011
Map
Historic_habitat_types-Map.pdf
05/20/2011
Map
SiteMap.pdf
05/20/2011
Map
Project location map.pdf
05/20/2011
Map
WillowCreek_PrelimDesignPlan.pdf
05/20/2011
Photo
Edmonds_Marsh-aerial_photo.jpg
05/20/2011
Progress report
Progress Report 07/22/2013.pdf
07/22/2013
Progress report
Progress Report 03/29/2013.pdf
03/29/2013
Progress report
Progress Report 11/15/2012.pdf
11/15/2012
Progress report
ProgressReport_from Consultant to Sponsor .pdf
11/13/2012
Progress report
Progress Report 08/10/2012.pdf
08/10/2012
Project partnership form
Manual_18AppendixJ-PartnerContribForm_CityofEdmonds.doc
08/25/2011
Project Support / Concern Documents
FINAL-Early_Feas_Study_ENTIRE.pdf
06/07/2013
Project Support / Concern Documents
DRAFT_Early Feasibility Study- Willow Creek Daylighting proj.pdf
04/24/2013
Project Support / Concern Documents
Tidal_Hydrology_Boundary Conditions_Edmonds-Marsh.xlsx
03/22/2013
Project Support / Concern Documents
EdmondsMarsh_Tidal_Hydrology_Modeling_Memo.pdf
03/22/2013
Project Support / Concern Documents
Alternative_Alignments_Analysis.pdf
03/22/2013
Project Support / Concern Documents
Response to Panel Review Comments-Willow_Creek_daylighting.docx
06/29/2011
Project Support / Concern Documents
05_EdmondsFEIS_Chapter_4.pdf
06/29/2011
Project Support / Concern Documents
04_EdmondsFEIS_Chapter_3.pdf
06/29/2011
Project Support / Concern Documents
Pentec_1998-WillowCreek-PortofEdmonds.pdf
06/29/2011
Project Support / Concern Documents
Site_Photos.pdf
05/26/2011
Project Support / Concern Documents
WillowCreekDaylighting_pre-proposal_BUDGET.xls
05/26/2011
Salmon Project Proposal
Final_Proposal_Willow_Creek_Daylighting_Feasibility_Study-11.docx
08/25/2011
Salmon Project Proposal
2011_SRFB_PSAR-Pre-Proposal_WillowCreekDaylightingM233.docx
05/26/2011
SRFB Review Panel Comment Form
Final Comment Form.docx
12/21/2011