Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #11-1553 (Completed)
Willow Creek daylighting
    Project Details    
Edmonds City of; Willow Creek daylighting (#11-1553)

Attachment #118230, Edmonds_Marsh-aerial_photo
Edmonds City of; Willow Creek daylighting (#11-1553) Attachment #118230, Edmonds_Marsh-aerial_photo

Edmonds City of; Willow Creek daylighting (#11-1553)

Attachment #118230, Edmonds_Marsh-aerial_photo
Project Status:  Closed Completed since 03/07/2014
 
Project Type:  Planning
Project Sponsor:  City of Edmonds
Funding Board:  Salmon Recovery Funding Board
              Funding  
Puget Sound Acq. & Restoration: $100,000
Total RCO Grant: $100,000 (66%)
Sponsor Match: $52,100 (34%)
Total Agreement: $152,100 (100%)
              Links
 

    Project Description    
City of Edmonds will explore the feasibility of maximizing Chinook salmon rearing habitat in Edmonds Marsh through daylighting the connection between Willow Creek and Puget Sound. Edmonds Marsh is located within the City of Edmonds in the Central Puget Sound basin. The feasilibility report will a) evaluate the topography and hydrology of the marsh area to determine the potential for use by juvenile Chinook; b) analyze three options for daylighting Willow Creek; c) assess the hydrology of a restored marsh system that identifies the freshwater and saltwater hydrology signal, average water elevation, maximum and minimum water levels and hydroperiod during tidal fluctuations; and d) provide conceptual designs for the preferred alternative.
The evaluation of sediment accretion, erosion, and transport, and storm water inputs may be part of a later feasibility assessment phase.

    Project Contacts    
         
Project Sponsor: City of Edmonds Lead Entity: Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
  Project Contact: Jerry Shuster
JShuster@bellevuewa.gov
(425) 452-5206
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
   

    Project Location    
General Area:   Puget Sound, Edmonds
County:   Snohomish
Legislative District:   21
Congressional District 2022:   02
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Possession Sound-N Elliot Bay
HUC8:   Puget Sound (17110019)
WRIA:   Cedar - Sammamish
Sections:   26
Township:   T27NR03E
Coordinates:   47.80604785
-122.39087121

    Worksites    
Worksite NameScope of WorkActual Planning Cost
Edmonds Marsh (#1) Conducting habitat restoration scoping and feasibility studies (B.1.b.8), Habitat surveys (B.2.d), Landowner willingness inventory $154,463
 Total$154,463
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Edmonds Marsh (#1)   Property 1 - Edmonds Marsh Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

      
Area Encompassed (acres) (B.0.b.1) 26.6

Salmonid Habitat Assessment / Inventory
      Habitat surveys (B.2.d)
Acres of habitat assessed (B.2.d.2) 26.0
      Landowner willingness inventory
Number of landowers contacted 1

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/08/2011
Data Gathering Started 12/08/2011 Collecting existing reports; identifying data gaps. See eligible pre-ageement expenses per Manual 18 (2011) page 65.
RFP Complete/Consultant Hired 07/19/2012
Annual Project Billing Due 07/31/2012 Required by this date.
Progress Report Due 08/08/2012
Progress Report Due 03/31/2013
Draft Design to RCO 04/12/2013 (was 2/2013) Draft Conceptual Design as described in Appendix D Manual 18 (2012)
Draft Plan to RCO 04/12/2013 (was dec-2012) Draft Feasibility Study as described in Appendix D Manual 18 (2012).
Annual Project Billing Due 07/31/2013
Progress Report Due 08/01/2013
Final Design to RCO 08/31/2013 Final Conceptual Designs as described in Appendix D Manual 18 (2012)
Final Plan to RCO 08/31/2013 Final Feasibility Study as described in Appendix D Manual 18 (2012)
Final Report Due 12/31/2013
Agreement End Date 12/31/2013 PROJECT CLOSING. This is the latest project end date possible for this design project. All expenditures must be prior to this date.
Final Billing Due 02/28/2014 Provide your final invoice and report within 60 days of Agreement End Date.


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 11-1553 Agreement.pdf 04/03/2012
Amendment - State 11-1553-amend1-sponsor change.pdf 07/05/2019
Amendment - State 11-1553-amend1-internal.pdf 07/05/2019
Amendment request 11-1553_WillowCreekDaylighting_sponsor_change_request_10-12-.pdf 10/12/2012
Billing forms Billings.pdf 07/05/2019
Cost Estimate FINALCostEstimates-ProjectBudget.xlsx 08/25/2011
Design document ConceptualDesign_ProposedConditionsMap-EdmondsMarsh.pdf 03/22/2013
Final project report Final Report 03/07/2014.pdf 03/07/2014
Inspection Report Early App Site Visit Photos 06-08-11.pptx 07/27/2011
Landowner acknowledgement form WillowCreek_CityofEdmonds-LandownerAcknowForm.doc 05/20/2011
Map ExistingConditionsMap_EdmondsMarsh.pdf 03/22/2013
Map Willow Creek historic 1870s T sheet.pdf 11/18/2011
Map Historic_habitat_types-Map.pdf 05/20/2011
Map SiteMap.pdf 05/20/2011
Map Project location map.pdf 05/20/2011
Map WillowCreek_PrelimDesignPlan.pdf 05/20/2011
Photo Edmonds_Marsh-aerial_photo.jpg 05/20/2011
Progress report Progress Report 07/22/2013.pdf 07/22/2013
Progress report Progress Report 03/29/2013.pdf 03/29/2013
Progress report Progress Report 11/15/2012.pdf 11/15/2012
Progress report ProgressReport_from Consultant to Sponsor .pdf 11/13/2012
Progress report Progress Report 08/10/2012.pdf 08/10/2012
Project partnership form Manual_18AppendixJ-PartnerContribForm_CityofEdmonds.doc 08/25/2011
Project Support / Concern Documents FINAL-Early_Feas_Study_ENTIRE.pdf 06/07/2013
Project Support / Concern Documents DRAFT_Early Feasibility Study- Willow Creek Daylighting proj.pdf 04/24/2013
Project Support / Concern Documents Tidal_Hydrology_Boundary Conditions_Edmonds-Marsh.xlsx 03/22/2013
Project Support / Concern Documents EdmondsMarsh_Tidal_Hydrology_Modeling_Memo.pdf 03/22/2013
Project Support / Concern Documents Alternative_Alignments_Analysis.pdf 03/22/2013
Project Support / Concern Documents Response to Panel Review Comments-Willow_Creek_daylighting.docx 06/29/2011
Project Support / Concern Documents 05_EdmondsFEIS_Chapter_4.pdf 06/29/2011
Project Support / Concern Documents 04_EdmondsFEIS_Chapter_3.pdf 06/29/2011
Project Support / Concern Documents Pentec_1998-WillowCreek-PortofEdmonds.pdf 06/29/2011
Project Support / Concern Documents Site_Photos.pdf 05/26/2011
Project Support / Concern Documents WillowCreekDaylighting_pre-proposal_BUDGET.xls 05/26/2011
Salmon Project Proposal Final_Proposal_Willow_Creek_Daylighting_Feasibility_Study-11.docx 08/25/2011
Salmon Project Proposal 2011_SRFB_PSAR-Pre-Proposal_WillowCreekDaylightingM233.docx 05/26/2011
SRFB Review Panel Comment Form Final Comment Form.docx 12/21/2011

Back to top Date of last change: 06/30/2023