Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #09-1623 (Completed)
Lower Wenatchee River Flow Enhancement Project
    Project Details    
Trout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166517, Don & Aaron, TU
Trout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623) 06/06/2013, Attachment #166517, Don & Aaron, TU

Trout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166517, Don & Aaron, TU Trout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

Attachment #84035, Pioneer_COW_pipeline_mapTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

12/11/2012, Attachment #155960, 12-11-12 photos 007 JPG (3)Trout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

11/12/2012, Attachment #155975, 11-12-12 Construction PhotoTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

11/28/2012, Attachment #155976, 11-28-12 Construction Trout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

12/07/2012, Attachment #155978,  12-07-12 ConstructionTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166508, Pump Station along Wenatchee RiverTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166509, Screen Location - 28' under waterTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166510, North River Pump StationTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166511, PumpsTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166512, "Jockey" PumpTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166513, Powwow at Computer ScreenTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166514, Computer Screen CloseupTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166515, Pump PanelsTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166518, Pump HouseTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

06/06/2013, Attachment #166519, Monitor Diversion Dam to be RemovedTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

09/10/2013, Attachment #174067, Diversion Dam GoneTrout Unlimited Inc.; Lower Wenatchee River Flow Enhancement Project (#09-1623)

09/10/2013, Attachment #174068, Diversion Dam Gonzo
Project Status:  Closed Completed since 10/21/2013
 
Project Type:  Restoration
Project Sponsor:  Trout Unlimited Inc.
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $513,400
Total RCO Grant: $513,400 (49%)
Sponsor Match: $523,822 (51%)
Total Agreement: $1,037,222 (100%)
              Links
 

    Project Description    
The objective of this project is to improve habitat by increasing flows in the Lower Wenatchee by 15 cubic-feet per second (CFS). This project will initiate and implement the primary phase of the Pioneer Water Users Association project in the lower 7.5 miles of the Wenatchee River. This project will create infrastructure improvements for the Pioneer Water Users Association (PWUA) who operate and maintain the Gunn Ditch, which supplies water for agricultural and residential irrigation to shareholders. The project has several components that will address limiting factors in the Wenatchee and is part of the Upper Columbia Salmon Recovery Board implementation schedule. By initiating this project, other biologically productive restoration activities can also be implemented, including habitat improvements, diversion removal, and possible side channel reconnection.

This project has two key elements: 1) The project will replace the PWUA current conveyance system, a gravity fed open ditch, with a new enclosed pressurized system and 2) change the PWUA point of diversion from the flow limited Wenatchee River to the Columbia River. This project would put approximately 15 cfs of the historically diverted water back into the lower 7.5 miles of the Wenatchee River, benefiting habitat for fish, particularly during low flows. The water will be permanently protected as an in-stream flow right through Washington States Trust Water Rights Program (TWRP).

    Project Contacts    
         
Project Sponsor: Trout Unlimited Inc. Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Aaron Penvose
apenvose@tu.org
(509) 888-0970
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   lower wenatchee river, Chelan County, Wa
Waterbody:   Columbia River, Wenatchee River
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Lower Wenatchee
HUC8:   Wenatchee (17020011)
WRIA:   Wenatchee
Sections:   28
Township:   T23NR20E
Coordinates:   47.45918760
-120.33835561

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Lower Wenatchee River Flow Enhancement (#1) Architectural & Engineering (A&E), Irrigation practice improvement (C.3.e.1) $1,177,291
 Total$1,177,291
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Lower Wenatchee River Flow Enhancement (#1)   Property 1 - Pioneer Water User's Association Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Instream Flow Project
      Irrigation practice improvement (C.3.e.1)
Acre Feet Of Water Conserved (C.3.e.2) 7824
Cfs (Cubic Feet Per Second) Of Water Conserved (C.3.e.3) 38

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/10/2009
Applied for Permits 05/15/2010 permits will be filled out
Cultural Resources Complete 05/15/2010 by USFWS
Progress Report Due 07/31/2010
Annual Project Billing Due 07/31/2010
Progress Report Due 12/01/2010
Progress Report Due 07/31/2011
Annual Project Billing Due 07/31/2011
Progress Report Due 12/01/2011
Annual Project Billing Due 07/31/2012
Progress Report Due 07/31/2012
Progress Report Due 12/01/2012
Progress Report Due 07/31/2013
Annual Project Billing Due 07/31/2013
Progress Report Due 12/01/2013 no progress report required if final documents are submitted prior to December 31, 2013
Agreement End Date 12/15/2013 original proposed end date 12/15/2012


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State Agreement.pdf 04/21/2010
Agreement attachment Findings of Fact, 6-27-12.pdf 10/17/2012
Agreement attachment Findings of Fact, 9-19-12.pdf 10/17/2012
Agreements - Special Army Authorization.pdf 10/17/2012
Agreements - Special 4. CC Roads.pdf 10/17/2012
Amendment request Approved Cost Increase Amend 07-25-13.doc 07/26/2013
Application authorization SRFB_TRIB_Final_Proposal_07_24_09_WRC revised (3).pdf 08/27/2009
Correspondence Cost Increase 12-19-12 Approve 1-02-13.pdf 12/21/2012
Correspondence Post Application Individual Project Comments.pdf 12/11/2009
Correspondence Letter of Support.pdf 08/28/2009
Correspondence Pioneer Ditch RTT product review 20 Feb2009_Final.pdf 08/27/2009
Cultural Resources: Correspondence DAHP.pdf 10/17/2012
Design document Final 30% Engineering Report 07-22-10.pdf 12/06/2010
Design document 30% Design Drawings 7-22-10.pdf 12/06/2010
Environmental Site Assessment Report Updated2008WenatcheeRiverWUAassessment_Appendix_A_82609_adre.pdf 08/27/2009
Final project report Final Report 07/10/2014.pdf 07/10/2014
Final project report Final Report 10/21/2013.pdf 10/21/2013
Final project report Pioneer - Final Narrative Report 8-1-13.pdf 08/08/2013
Inspection Report Final Inspection Photos 09-10-13.pptx 10/21/2013
Inspection Report Final Inspection Photos 06-06-13.pptx 06/10/2013
Legal description PWUA_WR_2.pdf 08/28/2009
Legal description PWUA_WR_1.pdf 08/28/2009
Map Pioneer_COW_pipeline_map.jpg 08/28/2009
Milestones SRFB_Progress_Report_AUG11_to_OCT11.doc 12/02/2011
News Article 09-1623 Leavenworth Echo 4-27-2011-.pdf 05/31/2011
News Article Sockeye Season Ends Due to High Water Temp WW Article 8-11-.pdf 09/18/2009
Permit CC DNS SEPA.pdf 10/17/2012
Permit 10. WSDOT General Permit.pdf 10/17/2012
Permit USACE Permit 33.pdf 10/17/2012
Permit USACE Permit 27.pdf 10/17/2012
Permit WDFW - HPA.pdf 10/17/2012
Permit 2. FERC Permit.pdf 10/17/2012
Permit 1. CCPUD Permit.pdf 10/17/2012
Photo Diversion Dam Gonzo.jpg 10/21/2013
Photo Diversion Dam Gone.jpg 10/21/2013
Photo Monitor Diversion Dam to be Removed.jpg 06/10/2013
Photo Pump House.jpg 06/10/2013
Photo Don & Aaron, TU.jpg 06/10/2013
Photo Pump Panels.jpg 06/10/2013
Photo Computer Screen Closeup.jpg 06/10/2013
Photo Powwow at Computer Screen.jpg 06/10/2013
Photo "Jockey" Pump.jpg 06/10/2013
Photo Pumps.jpg 06/10/2013
Photo North River Pump Station.jpg 06/10/2013
Photo Screen Location - 28' under water.jpg 06/10/2013
Photo Pump Station along Wenatchee River.jpg 06/10/2013
Photo 12-07-12 Construction.jpg 12/21/2012
Photo 11-28-12 Construction .jpg 12/21/2012
Photo 11-12-12 Construction Photo.jpg 12/21/2012
Photo 12-11-12 photos 007 JPG (3).jpg 12/21/2012
Progress report Progress Report 10/19/2012.pdf 10/19/2012
Progress report Progress Report 12/06/2011.pdf 12/06/2011
Progress report Progress Report 07/26/2011.pdf 07/26/2011
Progress report SRFB Progress_Report_July10-June11.doc 07/25/2011

Back to top Date of last change: 08/09/2024