Mill Creek Fish Passage - Division to Roosevelt
|
Tri-State Steelheaders Inc; Mill Creek Fish Passage - Park to Roosevelt (#19-1718)
Attachment #395509, Mill Creek Proposed Channel redesign aerial.jpg
|
|
|
|
|     Funding |
  |
|
|
|     Links |
|
|   |
|
|
|
Flood control measures on Mill Creek include a concrete channel that extends over two miles through Walla Walla. The Mill Creek Barrier Assessment completed in 2009 identified and described barriers for Endangered Species Act (ESA) listed steelhead and bull trout and for reintroduced spring Chinook. Returning adults encounter flow dependent depth and velocity barriers, and a lack of resting opportunities. Juvenile fish encounter low spring flows, and high water temperatures in late spring. Often by mid-May, adults and juveniles become trapped in the flood control channel where they experience lethal temperatures. Many of these passage issues are considered imminent threats in the Snake River Salmon Recovery Plan. The Mill Creek channel upstream of the flood control project is a critical and under-utilized area for spawning and rearing of ESA listed species. Restoring fish passage to upper Mill Creek provides an important recovery opportunity for ESA listed fish, as well as good habitat for other native fish and reintroduced spring Chinook. Designs for remodeling the concrete channel to improve water velocities and depths have been implemented and tested in three previous construction projects. This project will complete construction of the Division to Roosevelt portion of the concrete channel. This project is one of multiple projects that are necessary to correct fish passage problems in the Mill Creek flood control project.
|
|
General Area:
|
|
Mill Creek, Walla Walla WA
|
|
County:
|
|
Walla Walla
|
|
Legislative District:
|
|
16
|
|
Congressional District 2022:
|
|
05
|
|
Salmon Recovery Regions:
|
|
Snake River
|
|
Watershed Administrative Unit:
|
|
Walla Walla Agricultural Lands
|
|
HUC8:
|
|
Walla Walla (17070102)
|
|
WRIA:
|
|
Walla Walla
|
|
Sections:
|
|
21
|
|
Township:
|
|
T07NR36E
|
|
Coordinates:
|
|
46.06918891 -118.31953593
|
|
|
Amounts may not be complete
| Worksite Name | | Property Name | Landowner Type |
|
Mill Creek channel - Division St to Roosevelt St (#1)
|
|
Property 1 - Mill Creek channel
|
Local Government
|
| | | | Total |
Amounts may not be complete
| | Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Passage Improvement |
| Fishway chutes or pools installed (C.2.d.1) |
|
|
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
|
18
|
| |
|
|
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
|
1
|
| Milestone Name | Target Date | Description |
|
Project Start
|
07/01/2019
|
|
|
Cultural Resources Complete
|
07/01/2019
|
previously completed with 09-1187. Cultural Resources Survey required. Survey must meet standard reporting format and requirements.
|
|
Progress Report Due
|
03/01/2020
|
|
|
Annual Project Billing Due
|
07/31/2020
|
|
|
Progress Report Due
|
08/01/2020
|
|
|
Applied for Permits
|
08/31/2020
|
|
|
Progress Report Due
|
03/01/2021
|
|
|
Progress Report Due
|
12/22/2021
|
|
|
Annual Project Billing Due
|
12/31/2021
|
|
|
Permits Complete
|
01/03/2022
|
|
|
Progress Report Due
|
03/01/2022
|
|
|
Bid Awarded/Contractor Hired
|
03/31/2022
|
|
|
Landowner Agreement to RCO
|
05/15/2022
|
|
|
Funding Acknowl Sign Posted
|
06/15/2022
|
|
|
Progress Report Due
|
06/30/2022
|
|
|
Annual Project Billing Due
|
06/30/2022
|
|
|
Restoration Started
|
07/05/2022
|
|
|
Progress Report Due
|
12/31/2022
|
|
|
Progress Report Due
|
06/30/2023
|
|
|
Annual Project Billing Due
|
06/30/2023
|
|
|
Restoration Complete
|
11/01/2023
|
|
|
RCO Final Inspection
|
12/31/2023
|
|
|
Agreement End Date
|
12/31/2023
|
|
|
Other
|
12/31/2023
|
as-built drawings submitted to RCO
|
|
Final Report Due
|
03/31/2024
|
|
|
Final Billing Due
|
03/31/2024
|
|
| Attachment Type | Attachment Title | Attach Date |
|
Agreement - State
|
19-1613 Agreement.pdf
|
12/26/2019
|
|
Amendment - State
|
Amendment #3 - Time Extension - signed.pdf.pdf
|
06/13/2023
|
|
Amendment - State
|
Amendment #2 - Scope Change and Match Reduction.pdf
|
11/02/2022
|
|
Amendment - State
|
Amendment #1 - Time Extension.pdf
|
04/11/2022
|
|
Amendment request
|
FBRB Amendment #2 Request.pdf
|
11/17/2022
|
|
Applicant Resolution/Authorizations
|
App Auth.pdf
|
07/09/2019
|
|
Application Review Report
|
Application Review Report, 19-1613R(compl 07/23/19 13:00:54).pdf
|
07/23/2019
|
|
Barrier evaluation form
|
Mill Creek Fish Passage Assessment .pdf
|
07/09/2019
|
|
Barrier evaluation form
|
Correction Analysis Form.doc.doc
|
07/08/2019
|
|
Correspondence
|
Training Reimbursement Request.docx.docx
|
06/01/2022
|
|
Cost Estimate
|
Cost Estimate .xlsx
|
07/09/2019
|
|
Design document
|
Plans for construction bid package.pdf
|
02/22/2022
|
|
FBRB Final Application Questions
|
FBRB-FinalApplicationQuestions Division to Roosevelt.docx
|
07/23/2019
|
|
Final project report
|
Final Report, 19-1613 (accepted 12/19/23 07:49:19).pdf
|
12/19/2023
|
|
Map: Multi-site and geographic envelope
|
MC watershed.jpg.jpg
|
07/08/2019
|
|
Map: Restoration Worksite
|
Mill Creek phases - completed and planned.jpg
|
07/23/2019
|
|
Milestones
|
Restoration milestone worksheet.doc.doc
|
07/10/2019
|
|
Photo
|
Mill Creek current configuration.JPG.jpg
|
07/08/2019
|
|
Photo
|
Mill Creek proposed channel redesign.JPG.jpg
|
07/08/2019
|
|
Photo
|
Mill Creek Proposed Channel redesign aerial.jpg.jpg
|
07/08/2019
|
|
Plans and Bid Specifications
|
Final Plans.pdf
|
07/09/2019
|
|
Progress report
|
Progress Report, 19-1613 (accepted 07/11/23 10:39:18).pdf
|
07/11/2023
|
|
Progress report
|
Progress Report, 19-1613 (accepted 01/12/23 12:01:38).pdf
|
01/12/2023
|
|
Progress report
|
Progress Report, 19-1613 (accepted 07/01/22 07:26:48).pdf
|
07/01/2022
|
|
Progress report
|
Progress Report, 19-1613 (accepted 03/03/22 14:19:54).pdf
|
03/03/2022
|
|
Progress report
|
Progress Report, 19-1613 (accepted 01/05/22 15:38:15).pdf
|
01/05/2022
|
|
Progress report
|
Progress Report, 19-1613 (accepted 02/23/21 11:29:47).pdf
|
02/23/2021
|
|
Progress report
|
Progress Report, 19-1613 (accepted 08/03/20 10:14:35).pdf
|
08/03/2020
|
|
Project Application Report
|
Application Report, 19-1613R (submitted 07/10/19 14:38:20).pdf
|
07/10/2019
|