Peshastin RM 8.8 Side Channel Reconnection Design
    Project Details    
Chelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)

05/21/2012, Attachment #151963, BRG Side Channel to Reconnect
Chelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447) 05/21/2012, Attachment #151963, BRG Side Channel to Reconnect

Chelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)

05/21/2012, Attachment #151963, BRG Side Channel to Reconnect Chelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)

Attachment #149651, Existing side channel conditionsChelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)

05/21/2012, Attachment #151962, UC RTT and SRFB RP Early Site VisitChelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)

05/21/2012, Attachment #151964, More of Side ChannelChelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)

05/21/2012, Attachment #151965, Robes Parrish, USFWS, Looking at SomethingChelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)
, Progress Report: 08/28/2015
07/14/2015, Attachment #237423, Peshastin Historic Channel UpstreamChelan Co Natural Resource; Peshastin RM 8.8 Side Channel Reconnection Design (#12-1447)
, Progress Report: 08/28/2015
07/14/2015, Attachment #237424, Peshastin Creek historic channel
Project Status:  Closed Completed since 12/11/2015
 
Project Type:  Planning
Project Sponsor:  Chelan County Natural Resources Department
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $58,755
Total RCO Grant: $58,755 (85%)
Sponsor Match: $10,369 (15%)
Total Agreement: $69,124 (100%)
              Links
 

    Project Description    
The objective of the Peshastin Creek RM 8.8 Side Channel Reconnection Design project is to re-connect off-channel habitat and floodplain to provide rearing and refuge habitat for juvenile salmonids. The construction of SR 97 in 1956 disconnected 35 acres of floodplain and 4,300 linear feet of channel. In 2011-12 CCNRD conducted site assessments and landowner outreach to develop four conceptual reconnection alternatives. This proposal seeks conceptual design funds toassess the existing geomorphic and hydraulic processes to guide the selection and conceptual design of restoration efforts in Peshastin Creek. Due to the complexity of this site and the existing sediment transport load, a more thorough evaluation is warranted prior to advancing to the preliminary design stage. The CCNRD intends to work with the landowners and stakeholders to examine and select a preferred alternative. Peshastin Creek is a Category 2 watershed and contains Major spawning area for steelhead and minor spawning area for spring Chinook, and is a bull trout core area (UCRTT 2008). Within Peshastin Creek, the reconnection of floodplain and lengthening of the mainstem is a Biological Strategy Tier 1 action and top priority for addressing limiting habitat factors and the recovery and long-term viability of salmonids (UCRTT 2008, UCSRB 2007). The Peshastin Creek Tributary and Reach Assessment (TRA) (Interfluve 2010) identified the reconnection of the historical main channel at the RM 8.8R project site (BRG Site) as a priority habitat restoration project within Peshastin Creek.

    Project Contacts    
         
Project Sponsor: Chelan County Natural Resources Department Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Mike Kane
mike.kane@co.chelan.wa.us
(509) 885-2126
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   US 97, Leavenworth side of Blewett Pass, just upstream of Camas Creek
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Mt Stuart
HUC8:   Wenatchee (17020011)
WRIA:   Wenatchee
Sections:   24
Township:   T23NR17E
Coordinates:   47.46900045
-120.65704122

    Worksites    
Worksite NameScope of WorkActual Planning Cost
Peshastin RM 8.8 side channel (#1) Conducting habitat restoration scoping and feasibility studies (B.1.b.8) $73,824
 Total$73,824
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Peshastin RM 8.8 side channel (#1)   Property 1 - Peshastin Side Channel Private
   Total
Amounts may not be complete

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/06/2012
RFP Complete/Consultant Hired 03/31/2015
Data Gathering Started 04/01/2015
Annual Project Billing Due 07/31/2015
Progress Report Due 07/31/2015
Agreement End Date 10/30/2015
Final Design to RCO 01/29/2016 Conceptual Design Deliverables, per Appendix D-1, Manual 18
Final Report Due 01/29/2016
Final Billing Due 01/29/2016
Special Conditions Met 01/29/2016


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State Agreement.pdf 03/22/2013
Amendment - State 12-1447 Amend #1 Cost Change.pdf 04/23/2015
Amendment - State 12-1447 Amend #2 Tme Extension.pdf 03/23/2015
Correspondence Final SRFB RP Comment Form 10-26-12.docx 02/05/2013
Cost Estimate Full Channel Conceptual Cost Est. 10-23-15.pdf 12/03/2015
Design document Baseline Assess Appendix B 10-26-15.pdf 12/03/2015
Design document Baseline Assess Appendix A 10-26-15.pdf 12/03/2015
Design document Baseline Reach Assess 10-26-15.pdf 12/03/2015
Design document Full Channel Conceptual Design 10-23-15.pdf 12/03/2015
Design document Full Chan Alt_Draft_Concept_07-27-15.pdf 08/28/2015
Final project report Final Report 12/11/2015.pdf 12/11/2015
Photo Peshastin Creek historic channel.jpg 08/28/2015
Photo Peshastin Historic Channel Upstream.jpg 08/28/2015
Photo Robes Parrish, USFWS, Looking at Something.jpg 09/06/2012
Photo More of Side Channel.jpg 09/06/2012
Photo BRG Side Channel to Reconnect.jpg 09/06/2012
Photo UC RTT and SRFB RP Early Site Visit.jpg 09/06/2012
Photo Existing side channel conditions.jpg 08/13/2012
Progress report Progress Report 08/31/2015.pdf 08/31/2015
Project plan document Basis of Design Report 10-26-15.pdf 12/03/2015
Project plan document Alternatives Analysis 10-26-15.pdf 12/03/2015
Project presentation Peshastin Creek-BRG Side Channel Reconnection Design.pptx 06/15/2012
Salmon Project Proposal PeshastinBRG FinalProposal.pdf 08/13/2012
Scope of work Geomorphic & Hyrdaulic Assess SOW 12-29-14.docx 03/19/2015
SRFB Review Panel Comment Form (12-1447) Peshastin RM 8 8 Side Channel Reconnection Design.docx 04/16/2013
SRFB Review Panel Comment Form Response to SRFB Review Panel October 2012 Comments_BRG_2.docx 10/12/2012
SRFB Review Panel Comment Form Responses to Comments.docx 08/24/2012

Back to top Date of last change: 04/16/2024