Skip to main content
Save as PDF
Top Navigation
About PRISM and Project Search
Project Snapshot
PRISM Project #21-1427 (In Progress)
George Davis Creek Fish Passage Construction
Collapse All
Project Details
Sammamish City of; George Davis Creek Fish Passage Construction (#23-1943) Attachment #496623, Upstream Side of ELSP.jpg
Project Status:
 
Funding Agency Approved since 07/01/2023
Project Type:
 
Restoration
Project Sponsor:
 
City of Sammamish
Funding Board:
 
Recreation and Conservation Office
    Funding
 
BA Fish Barrier Removal Board:
$1,300,000
Total RCO Grant:
$1,300,000
(85%)
Sponsor Match:
$230,000
(15%)
Total Agreement:
$1,530,000
(100%)
    Links
 
Attachments: 59 files
Project Description
The City of Sammamish will use this grant to fund final design and construction to remove three fish passage barriers on the lowest one half-mile of George Davis Creek, east of Lake Sammamish. In partnership with King County, the outcome will eliminate a total of four barriers between Lake Sammamish and the next barrier at NE 6th St (920113). The project is located in King County near East Lake Sammamish Parkway (ELSP) at NE 7th Court. The City will remove three barriers including 920017, 920111, and 920112 (the concrete dam 1,140 feet upstream of Lake Sammamish). The County will remove 920268 with their trail project. Combined, the outcome will restore fish access beyond the dam, to 4,000 lineal feet (.75 mi) of high-quality spawning and rearing ecosystem habitat. The target species supported are the native kokanee salmon, coho, sockeye, steelhead, and cutthroat and rainbow trout which will greatly benefit from the significant increase in habitat gain. During recent years, kokanee have been observed annually along the 100 feet of accessible stream, making this an exciting opportunity to revive the population and runs in this tributary stream to Lake Sammamish. Since 2018, WRIA 8, the Kokanee Work Group, the Snoqualmie Indian Tribe, the City of Sammamish, King County, and several private property owners have identified George Davis Creek as a regionally significant stream for kokanee salmon restoration and a priority for capital investment to improve stormwater conveyance.
Project Contacts
Project Sponsor:
City of Sammamish
Lead Entity:
Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Project Contact:
Toby Coenen
tcoenen@sammamish.us
(425) 295-0567
Funding Agency:
Recreation and Conservation Office
Project Manager:
John Foltz
john.foltz@rco.wa.gov
13608678573
Project Location
General Area:
George Davis Creek, King County, WA
County:
King
Legislative District:
45
Congressional District 2022:
08
Salmon Recovery Regions:
Puget Sound
Watershed Administrative Unit:
Lake Sammamish
HUC8:
Lake Washington (17110012)
WRIA:
Cedar - Sammamish
Sections:
32
Township:
T25NR06E
Coordinates:
47.61539745
-122.06785122
Worksites
Worksite Name
Scope of Work
Proposed Restoration Cost
George Davis Creek (#1)
Architectural & Engineering (A&E), Culvert installed or improved (C.2.f.1), Fish passage blockages removed or altered (C.2.c.1)
$1,530,000
Total
$1,530,000
Amounts may not be complete
Properties
Worksite Name
Property Name
Landowner Type
George Davis Creek (#1)
Property 1 - 10a: Parcel no. 0777100040 (city-owned)
Local Government
George Davis Creek (#1)
Property 2 - 10b: East Lake Sammamish Parkway ROW
Local Government
George Davis Creek (#1)
Property 3 - 10b: Parcel no. 3225069305 (city-owned)
Local Government
George Davis Creek (#1)
Property 4 - 10c: Parcel no. 8653600290 (city-owned)
Local Government
George Davis Creek (#1)
Property 5 - Parcel no. 3225069296 (Hammer)
Private
George Davis Creek (#1)
Property 6 - Parcel no. 3225069284 (Starkey)
Private
Total
Amounts may not be complete
Project Metrics (Outcomes, Benefits)
Category / Work Type / Metric
Proposed
Restoration Metrics (rolled up from Worksite level)
Fish Passage Improvement
Fish passage blockages removed or altered (C.2.c.1)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1
Culvert installed or improved (C.2.f.1)
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.75
Number of culverts (C.2.f.2)
2
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
3
Project Permits
Permit Type
Applied
Date
Received
Date
Expiration
Date
Permit Number
Other Required Permits
12/08/2021
SUPS22-0003
Other Required Permits
Nationwide Permit
06/24/2020
NWS-2020-594
Shoreline Permit
SEPA
Hydraulics Project Approval [HPA]
Building Permit
Clear & Grade Permit
Project Attachments
Attachment Type
Attachment Title
Attach Date
Applicant Resolution/Authorizations
R2022-948 - George Davis Creek Fish Passage Grant-FINAL.pdf.pdf
04/29/2022
Application Document
PHS Report 2022-01-12.pdf.pdf
01/12/2022
Application Document
Attach_O-ECY_303d_Listing.pdf.pdf
01/12/2022
Application Document
Attach_R-KingCo_LakeSamm_ClimateChange.pd.pdf
01/12/2022
Application Document
Attach_Q-WCDG_CrossingDecisionTree.pdf.pdf
01/12/2022
Application Document
Attach_N-Muckleshoot_StateOfWatershed.pdf.pdf
01/12/2022
Application Document
Attach_L3-WDFW_Cutthroat_Status.pdf.pdf
01/12/2022
Application Document
Attach_L2-USFWS_CutthroatESU_Summary.pdf.pdf
01/12/2022
Application Document
Attach_L1-NOAA_CutthroatESU_Map.pdf.pdf
01/12/2022
Application Document
Attach_K-NOAA_SteelheadESU_Status.pdf.pdf
01/12/2022
Application Document
Attach_I-NOAA_CohoESU_Status.pdf.pdf
01/12/2022
Application Document
Attach_H2-NOAA-ChinookESU_Review.pdf.pdf
01/12/2022
Application Document
Attach_H1-NOAA_ChinookESU_Map.pdf.pdf
01/12/2022
Application Document
Attach_G6b-WRIA8-SteelheadDistData.pdf.pdf
01/12/2022
Application Document
Attach_G6a-WRIA8-SteelheadDist.pdf.pdf
01/12/2022
Application Document
Attach_G5-WRIA8_CutthroatDist.pdf.pdf
01/12/2022
Application Document
Attach_G4-WRIA8_SockeyeDist.pdf.pdf
01/12/2022
Application Document
G2-WRIA8_CohoDist.pdf.pdf
01/12/2022
Application Document
G1-WRIA8_ChinookDist.pdf.pdf
01/12/2022
Application Document
Attach_F1-KWG_KokaneeBlueprint.pdf.pdf
01/12/2022
Application Document
Attach_E-WRIA8_WorkPlan_2021.pdf.pdf
01/12/2022
Application Review Report
Grant Manager Comments, 21-1427R(compl 06/15/22 11:19).pdf
06/15/2022
Application Review Report
Grant Manager Comments, 21-1427R(rtnd 02/09/22 12:30).pdf
02/09/2022
Correspondence
20240207_GEORGE_FBRBGrant_ltr.pdf.pdf
05/14/2024
Correspondence
Cover Letter FBRB Application 5-2-22.pdf.pdf
04/29/2022
Cost Estimate
CostEstimateSpreadsheet_REVISED 2022.06.14.xlsx.xlsx
06/15/2022
Cost Estimate
Attach_C-60pct-EngrEstimate.pdf.pdf
01/12/2022
Cultural Resource Screening Report
Project Cultural Resource Screening Report (06/01/23 10:29:4.pdf
06/01/2023
Cultural Resource Screening Report
Project Cultural Resource Screening Report (04/26/23 16:31:0.pdf
04/26/2023
Design document
NHC_George_Davis_Hydraulic_Report_Appendix_R3.pdf.pdf
01/12/2022
Design document
Alternatives Analysis 2019.pdf.pdf
01/12/2022
Design document
ReducedGeorge Davis 60 Plans.pdf.PDF.pdf
01/12/2022
Design document
NHC_George_Davis_Hydraulic_Report_R2.pdf (1).PDF.pdf
01/12/2022
Design document
Attach_P-NHC-DRAFT_HHReport.pdf.pdf
01/12/2022
Letters of Support
Attach_X-2-WRIA8_Support_Sammamish_FBRB.pdf.pdf
01/07/2022
Map: Area of Potential Effect (APE)
Project APE Report (06/01/23 10:29:43).pdf
06/01/2023
Map: Area of Potential Effect (APE)
Project APE Report (04/26/23 16:31:01).pdf
04/26/2023
Map: Restoration Worksite
Map - Restoration Sites.pdf.pdf
01/12/2022
Map: Restoration Worksite
Attach_A2-InglewoodBasin_Map.pdf.pdf
01/12/2022
Map: Restoration Worksite
Attach_A1-SiteMap.pdf.pdf
01/12/2022
Permit
20200617-JARPA Application.pdf.pdf
01/12/2022
Photo
High Flow Bypass System Outfall to Lake Sammamish 1.jpg.jpg
01/12/2022
Photo
High Flow Bypass System Outfall to Lake Sammamish 2.jpg.jpg
01/12/2022
Photo
Downstream Side of Dam.JPEG.jpeg
01/12/2022
Photo
Dock to be Removed.JPEG.jpeg
01/12/2022
Photo
Upstream Side of ELSP.jpg.jpg
01/12/2022
Photo
629 East Lake Sammamish Shore Lane.jpg.jpg
01/12/2022
Photo
Downstream Side of ELSP.jpg.jpg
01/12/2022
Project Application Report
Project Application Report, 21-1427R (sub 06/01/23 10:29:42).pdf
06/01/2023
Project Application Report
Project Application Report, 21-1427R (sub 05/02/22 12:53:06).pdf
05/02/2022
Project Application Report
Project Application Report, 21-1427R (sub 01/12/22 18:10:52).pdf
01/12/2022
Project plan document
Attach_S-EcologicalAssess_2016.pdf.pdf
01/12/2022
Project plan document
Attach_M-InglewoodBasinPlan.pdf.pdf
01/12/2022
Project Review Comments
Proj Review Comments Eval, 21-1427R(compl 06/01/23 10:29).pdf
06/01/2023
Visuals
George Davis Creek Restoration 21-1427_to RCO.pdf.pdf
06/15/2023
Visuals
Attach_U-KingCo-ELSTrailPresentation.pdf.pdf
01/12/2022
WDFW barrier & screening forms
WDFW 920017_Barrier Report.pdf.pdf
04/29/2022
WDFW barrier & screening forms
Attach_D2-WDFW_BarrierReport_920112_Dam.p.pdf
01/12/2022
WDFW barrier & screening forms
Attach_D1-WDFW_BarrierReport_920111_ELSP..pdf
01/12/2022
Back to top
Date of last change: 08/06/2024