Asotin IMW Monitoring 2017
|
    Funding |
  |
|
    Links |
  |
|
|
The Asotin County Conservation District is requesting funding is to support ongoing monitoring in the Asotin Creek Intensively Monitored Watershed project (Asotin IMW). The project was started in 2008 and is expected to run until 2019. The funds are being requested to support i) juvenile steelhead PIT tagging and mark-recapture surveys and replace damaged PIT tag array equipment, and ii) habitat monitoring using the Columbia Habitat Monitoring protocol (CHaMP). These two monitoring efforts are being used to assess the effectiveness of large woody debris restoration at increasing juvenile productivity in Asotin Creek. Three tributaries in Asotin Creek need to be monitored: Charley Creek, North Fork Asotin Creek, and South Fork Asotin Creek. extent of fish monitoring is 12 sites 300-500 m in length, 4 in each tributary (see attached map). The extent of the habitat monitoring is 12 CHaMP sites (length 160-200 m) in Charley and North Fork Creek – Tetra Tech is funding CHaMP monitoring in South Fork Creek in 2017. This project will support the ESA listed summer steelhead recovery. All of the fish and habitat data collected will be made publically available in the PTAGIS (ptagis.org) and on the CHaMP website (champmonitoring.org). Analyses of the data will be conducted with other funds provided to the Asotin IMW by PSMFC.
|
Worksite Name | Scope of Work | Actual Monitoring Cost |
Asotin (#1)
|
Intensively monitored watershed (E.1.c.15)
|
$177,000
|
| Total | $177,000 |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Monitoring |
Intensively monitored watershed (E.1.c.15) |
|
# acres (to nearest 0.1 acre) Intensively monitored watershed (E.1.c.15.c)
|
1000.0
|
|
# miles (to nearest 0.01 mile) Intensively monitored watershed (E.1.c.15.a)
|
22.00
|
Milestone Name | Target Date | Description |
Project Start
|
01/19/2018
|
|
Progress Report Due
|
06/15/2018
|
|
Annual Project Billing Due
|
06/30/2018
|
|
Special Conditions Met
|
12/31/2018
|
annual report due to the Monitoring Panel by this date (report can also be progress report for same time frame for PSMFC)
|
Other
|
05/01/2021
|
revising the scope to "monitoring AND restoration"
|
Annual Project Billing Due
|
06/30/2021
|
|
Progress Report Due
|
12/23/2021
|
|
Special Conditions Met
|
12/31/2021
|
annual report due to the Monitoring Panel by this date (report can also be progress report for same time frame for PSMFC) AND Final Report for PRISM
|
Agreement End Date
|
03/31/2022
|
time extension agreement end date if requested by sponsor
|
Final Report Due
|
04/15/2022
|
|
Final Billing Due
|
04/30/2022
|
|