Driscoll Island Cold Water Refuge
|
Cascade Col Fish Enhance Group; Driscoll Island Cold Water Refuge (#11-1240)
05/23/2012, Attachment #152030, Dirty Water of Smilkameen River on Driscoll Island
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
Water temperatures frequently exceed salmonid preference and survival thresholds in the Okanogan and Similkameen Rivers. Throughout the Okanogan Basin significant efforts are underway to improve tributary habitat for spawning and rearing, increase in-stream flows, and improve upstream water management through negotiations with Canada and the US co-managers. Gains have been made, but high water temperatures remain one of the most significant limiting factors in the Okanogan watershed, particularly from July through September.
The Driscoll Island project presents an opportunity to investigate and design cold water off channel refuge for juvenile salmonids that would be available during a critical time of year when water temperatures often drive juveniles to migrate to less favorable habitats.
|
General Area:
|
|
Downstream of Oroville
|
County:
|
|
Okanogan
|
Legislative District:
|
|
07
|
Congressional District 2022:
|
|
04
|
Salmon Recovery Regions:
|
|
Upper Columbia River
|
Watershed Administrative Unit:
|
|
Upper Okanogan River
|
HUC8:
|
|
Similkameen (17020007)
|
WRIA:
|
|
Okanogan
|
Sections:
|
|
04
|
Township:
|
|
T39NR27E
|
Coordinates:
|
|
48.90823109 -119.43014383
|
|
|
Worksite Name | Scope of Work | Actual Planning Cost |
Driscoll Island (#1)
|
Conducting habitat restoration scoping and feasibility studies (B.1.b.8), Cultural resources, Preliminary design (B.1.b.11.a RCO)
|
$42,500
|
| Total | $42,500 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Driscoll Island (#1)
|
|
Property 1 - Driscoll Island
|
State Government
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
|
|
|
Area Encompassed (acres) (B.0.b.1)
|
4.0
|
Milestone Name | Target Date | Description |
Project Start
|
12/08/2011
|
|
Data Gathering Started
|
02/01/2012
|
|
RFP Complete/Consultant Hired
|
02/01/2012
|
|
Cultural Resources Complete
|
03/31/2012
|
Exempt from DAHP 05-05.
|
Progress Report Due
|
07/31/2012
|
|
Annual Project Billing Due
|
07/31/2012
|
|
Progress Report Due
|
01/31/2013
|
|
Draft Design to RCO
|
03/08/2013
|
|
Preliminary Design to RCO
|
06/08/2013
|
|
Special Conditions Met
|
06/08/2013
|
Appendix D, Preliminary Design Standards.
|
Final Design to RCO
|
06/08/2013
|
|
Agreement End Date
|
06/08/2013
|
|
Annual Project Billing Due
|
07/31/2013
|
|
Final Report Due
|
09/08/2013
|
|
Final Billing Due
|
09/08/2013
|
|