Seawest Granston (Middle Bear) Natural Area Rest.
|
    Funding |
  |
|
    Links |
  |
|
|
This project will restore critical salmon habitat within the Middle Bear Creek Natural Area along Bear Creek. These funds will be used for implementation of the riparian restoration phase.The overall goal of the Seawest Granston project is to raise the elevation of baseflow water levels within the reach to create off-channel aquatic habitat, lower (or at least maintain) water temperatures, and raise groundwater elevations in the adjacent riparian areas. Phase 1 of the Seawest Granston Habitat Restoration Project will focus on creating functional riparian plant communities that, in turn, will help to shade out invasive reed canary grass and provide food and dam-making materials for resident beaver. Beaver already occupy the site and have created several small dams within the project area, but they are severely limited by the paucity of woody vegetation in the riparian areas. This initial planting phase will be very aggressive, while acknowledging the likelihood (and desirability) of significant beaver predation. Some plantings will be protected from beaver predations, while others will not. Some plant species that beaver seem to avoid (Pacific ninebark, for instance) will be installed to ensure riparian function is increased. Habitat posts may be installed instream to wrack debris and support potential beaver dams. Subsequent phases of work may entail addition of large wood and/or beaver dam analogues (BDA's) to the reach.
|
General Area:
|
|
King County
|
County:
|
|
King
|
Legislative District:
|
|
45
|
Congressional District 2022:
|
|
08
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Sammamish River
|
HUC8:
|
|
Lake Washington (17110012)
|
WRIA:
|
|
Cedar - Sammamish
|
Sections:
|
|
20
|
Township:
|
|
T26NR06E
|
Coordinates:
|
|
47.73000416 -122.07027806
|
|
|
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Middle Bear Creek Natural Area, adjacent easement (#1)
|
|
Property 1 - Seawest Granston-Middle Bear Nat Area
|
Local Government
|
Middle Bear Creek Natural Area, adjacent easement (#1)
|
|
Property 2 - Awad parcel Conservation Easement
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Instream Habitat Project |
Channel structure placement (C.4.d.1) |
|
Miles of Stream Treated for channel structure placement (C.4.d.3)
|
0.45
|
|
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
|
0.5
|
|
Pools Created through channel structure placement (C.4.d.5)
|
8
|
|
Number of structures placed in channel (C.4.d.7)
|
39
|
Riparian Habitat Project |
Planting (C.5.c.1) |
|
Acres Planted in riparian (C.5.c.3)
|
8.8
|
Riparian Plant removal / control (C.5.h.1) |
|
Acres of riparian treated for plant removal/control (C.5.h.3)
|
8.0
|
Planting (C.5.c.1) |
|
Miles of streambank planted (C.5.c.4)
|
0.45
|
Riparian Plant removal / control (C.5.h.1) |
|
Miles of streambank treated for plant removal/control (C.5.h.4)
|
0.45
|
Planting (C.5.c.1) |
|
Average Riparian Width
|
300
|
Milestone Name | Target Date | Description |
Applied for Permits
|
08/01/2022
|
|
Permits Complete
|
08/24/2022
|
|
Project Start
|
09/22/2022
|
|
Restoration Started
|
09/22/2022
|
|
Landowner Agreement to RCO
|
12/15/2022
|
Must be provided to RCO prior to begining construction
|
Preliminary Design to RCO
|
12/15/2022
|
|
Annual Project Billing Due
|
03/01/2023
|
|
Progress Report Due
|
05/01/2023
|
|
Progress Report Due
|
10/20/2023
|
|
Final Design to RCO
|
01/01/2024
|
|
Cultural Resources
|
03/31/2024
|
No additional cultural resources work is required for this scope of work, project may proceed in accordance with RCO's Inadvertent Discovery Plan with the identified avoidance area. Any changes or additions to project actions will require cultural resourc
|
Restoration Complete
|
03/31/2024
|
|
Progress Report Due
|
03/31/2024
|
|
RCO Final Inspection
|
06/01/2024
|
|
Funding Acknowl Sign Posted
|
06/01/2024
|
|
Stewardship Plan to RCO
|
06/01/2024
|
|
Other
|
06/01/2024
|
As-built drawings provided to RCO is completed project differs from final design
|
Final Report Due
|
09/01/2024
|
|
Agreement End Date
|
09/18/2024
|
All expenditures must be prior to this date
|
Final Billing Due
|
12/18/2024
|
You have up to 90 days from Agreement End Date to submit final invoice
|
Attachment Type | Attachment Title | Attach Date |
Agreement - State
|
22-1190 Agreement - Seawest Granston (Middle Bear) Natural A.pdf
|
01/23/2023
|
Applicant Resolution/Authorizations
|
Applicant Resolution_Authorizations_RCO_SRFB_PSAR.pdf.pdf
|
03/01/2022
|
Application Document
|
Grant_agreement_Alert_for_RCO_SRFB_PSAR_Seawest_Granston_Res.pdf
|
02/23/2022
|
Application Document
|
Grant alert sent to King County council.pdf
|
02/23/2022
|
Application Document
|
WRIA8_supplemental_habitatprojects_Seawest Granston Middle B.docx
|
02/22/2022
|
Application Review Report
|
Grant Manager Comments, 22-1190R(compl 07/21/22 08:56).pdf
|
07/21/2022
|
Application Review Report
|
Grant Manager Comments, 22-1190R(rtnd 04/01/22 11:25).pdf
|
04/01/2022
|
Application Review Report
|
Grant Manager Comments, 22-1190R(rtnd 02/25/22 16:04).pdf
|
02/25/2022
|
Cost Estimate
|
SAL-CostEstimate_Seawest Granston MB Restoration_REDUCED_SWM.xlsx
|
06/27/2022
|
Cultural Resource Screening Report
|
Project Cultural Resource Screening Report (01/23/23 07:54:5.pdf
|
01/23/2023
|
Cultural Resource Screening Report
|
Project Cultural Resource Screening Report (10/07/22 10:47:4.pdf
|
10/07/2022
|
Cultural Resource Screening Report
|
Project Cultural Resource Screening Report (10/04/22 08:27:4.pdf
|
10/04/2022
|
Cultural Resource Screening Report
|
SG HPP review.pdf.pdf
|
02/10/2022
|
Easement
|
TCE Khabani.pdf.pdf
|
05/04/2023
|
Final design
|
SGPlantingPlan1-23-23.pdf.pdf
|
04/20/2023
|
Final project report
|
Final Report, 22-1190 (accepted 12/28/23 09:43:18).pdf
|
12/28/2023
|
Map: Area of Potential Effect (APE)
|
Project APE Report (01/23/23 07:54:52).pdf
|
01/23/2023
|
Map: Area of Potential Effect (APE)
|
Project APE Report (10/07/22 10:47:45).pdf
|
10/07/2022
|
Map: Area of Potential Effect (APE)
|
Project APE Report (10/04/22 08:32:41).pdf
|
10/04/2022
|
Map: Restoration Worksite
|
SeawestGranston Project Reach.pdf.pdf
|
02/22/2022
|
Map: Restoration Worksite
|
BC--Seawest Granston Project Location.pdf.pdf
|
02/22/2022
|
Permit
|
HPA 2022-4-511+01 for APP ID 28947.pdf.pdf
|
04/20/2023
|
Permit
|
2020_0708_Middle_Bear_Creek_Seawest_Gages_ParksMemo.pdf.pdf
|
04/20/2023
|
Photo
|
UpperDam.jpg.jpg
|
10/18/2023
|
Photo
|
PicketDam_Plantings.jpg.jpg
|
10/18/2023
|
Photo
|
Dam_w_plantings.jpg.jpg
|
10/18/2023
|
Photo
|
Pickets7.jpg.jpg
|
04/20/2023
|
Photo
|
Pickets3.jpg.jpg
|
04/20/2023
|
Photo
|
BearCreek.jpg
|
02/23/2022
|
Photo
|
BearCreekRCG.jpg
|
02/23/2022
|
Photo
|
RCG.jpg
|
02/23/2022
|
Photo
|
BearCk_SeawestGranston_CEw (26).JPG.jpg
|
02/23/2022
|
Photo
|
Rinck 2018 ProbesMap.jpg.jpg
|
02/10/2022
|
Preliminary design report
|
SeawestGranstonPrelimDesign.pdf.pdf
|
05/01/2023
|
Progress report
|
Progress Report, 22-1190 (accepted 10/18/23 12:24:36).pdf
|
10/18/2023
|
Progress report
|
Progress Report, 22-1190 (accepted 05/04/23 15:22:40).pdf
|
05/04/2023
|
Project Application Report
|
Project Application Report, 22-1190R (sub 10/07/22 10:47:41).pdf
|
10/07/2022
|
Project Application Report
|
Project Application Report, 22-1190R (sub 06/27/22 11:00:48).pdf
|
06/27/2022
|
Project Application Report
|
Project Application Report, 22-1190R (sub 03/09/22 13:29:25).pdf
|
03/09/2022
|
Project Application Report
|
Project Application Report, 22-1190R (sub 02/23/22 14:11:35).pdf
|
02/23/2022
|
Project plan document
|
Picket Install Fig 080322.pdf.pdf
|
04/20/2023
|
Project plan document
|
Picket As Built.pdf.pdf
|
04/20/2023
|
Project Review Comments
|
Proj Review Comments LE, 22-1190R(compl 10/07/22 10:47).pdf
|
10/07/2022
|
Project Review Comments
|
Proj Review Comments Initial, 22-1190R(compl 10/07/22 10:46).pdf
|
10/07/2022
|
Visuals
|
2022 Seawest Granston PSAR PresentationFINALsmall.pptx.pptx
|
03/17/2022
|