PRISM Project #15-1059 (Completed)
Bear Creek Reach 6 Restoration - Ph II Design
    Project Details    
Adopt A Stream Foundation; Bear Creek Reach 6 Restoration  - Ph II Design (#15-1059)

Attachment #216471, High Water Looking Upstream
Adopt A Stream Foundation; Bear Creek Reach 6 Restoration - Ph II Design (#15-1059) Attachment #216471, High Water Looking Upstream

Adopt A Stream Foundation; Bear Creek Reach 6 Restoration  - Ph II Design (#15-1059)

Attachment #216471, High Water Looking Upstream Adopt A Stream Foundation; Bear Creek Reach 6 Restoration  - Ph II Design (#15-1059)

Attachment #216469, High Water Lower Menader
Project Status:  Closed Completed since 06/14/2017
 
Project Type:  Planning
Project Sponsor:  Adopt A Stream Foundation
Funding Board:  Salmon Recovery Funding Board
              Funding  
Puget Sound Acq. & Restoration: $50,000
Total RCO Grant: $50,000 (100%)
Total Agreement: $50,000 (100%)
              Links
 

    Project Description    
The Adopt A Stream Foundation (AASF) is requesting funds to generate preliminary design deliverables focused on improving habitat conditions in a future restoration project. Grant funding will be used to complete preliminary designs (as described in Manual 18 Appendix D-2) for the second phase of stream restoration at the Friendly Village Mobile Home Park in Redmond, WA along Bear Creek Reach 6. AASF will create a Request for Proposals (RFP) and select a qualified consultant that will be responsible for topographic surveying, hydraulic analysis, preliminary and final designs, cultural resource consultation and permitting assistance. AASF will work closely with the consultant and the landowner to develop designs that will provide the maximum benefit to fish and be acceptable to the landowner.
The design completed with this current funding request will be used for a future restoration project that will directly address priorities for Bear/Cottage Lake Creeks in the WRIA 8 Conservation Strategy for Chinook salmon (threatened), including protecting and restoring riparian vegetation and floodplain connectivity. This project will address these habitat-limiting factors by focusing design on: installing Large Woody Debris, re-vegetating the riparian buffer, increasing flood plain connectivity and re-establishing stream processes. Stakeholders in the design process include: AASF, WRIA 8, permit agencies, and Friendly Village Park landowner.


    Project Contacts    
         
Project Sponsor: Adopt A Stream Foundation Lead Entity: Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
  Project Contact: Walter Rung
walterr@streamkeeper.org
(425) 316-8592 111
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
   

    Project Location    
General Area:   Bear Creek
County:   King
Legislative District:   48
Congressional District 2022:   01
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Sammamish River
HUC8:   Lake Washington (17110012)
WRIA:   Cedar - Sammamish
Sections:   06
Township:   T25NR06E
Coordinates:   47.68251047
-122.09297632

    Worksites    
Worksite NameScope of WorkActual Planning Cost
Bear Creek Reach 6 (#1) Cultural resources, Preliminary design (B.1.b.11.a RCO) $50,000
 Total$50,000
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Bear Creek Reach 6 (#1)   Property 1 - Friendly Village Park Private
Bear Creek Reach 6 (#1)   Property 2 - Sewer Line - Owned by Friendly Village Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

      
Area Encompassed (acres) (B.0.b.1) 1.0
Miles of Stream and/or Shoreline Affected (B.0.b.2) 0.06

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/09/2015
Data Gathering Started 03/02/2016
RFP Complete/Consultant Hired 03/02/2016
Progress Report Due 06/01/2016
Annual Project Billing Due 06/01/2016
Cultural Resources Complete 07/01/2016
Progress Report Due 10/31/2016
Draft Design to RCO 11/01/2016
Preliminary Design to RCO 12/31/2016
Final Report Due 05/01/2017
Agreement End Date 05/01/2017
Final Billing Due 07/30/2017


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 15-1059 Project Agreement.pdf 02/02/2016
Applicant Resolution/Authorizations 15-1059 FV Ph II App Authorization.pdf 12/15/2015
Application Document Not State Owner Aquatic Lands.docx 03/18/2015
Application Review Report Application Review Report, 15-1059P(compl 10/06/15 13:47:37).pdf 10/06/2015
Application Review Report Application Review Report, 15-1059P(rtnd 10/06/15 11:20:39).pdf 10/06/2015
Application Review Report Application Review Report, 15-1059P(compl 08/27/15 16:09:15).pdf 08/27/2015
Application Review Report Application Review Report, 15-1059P(rtnd 08/21/15 10:58:39).pdf 08/21/2015
Bid Request FV Phase II RFP_MKedits8-26.docx 08/27/2015
Billing forms Invoice 20160926163232946.pdf 09/26/2016
Billing forms Invoice 20160926141446269.pdf 09/26/2016
Billing forms Invoice 20160926141437459.pdf 09/26/2016
Billing forms Invoice 20160926141454618.pdf 09/26/2016
Cost Estimate Budget Sheet FVII Planning CR_EST.xlsx 08/27/2015
Design document Bear Creek Reach 6 Restoration Phase 2 15-1059 Final Basis o.pdf 05/01/2017
Design document Freindly Village Final Des 12-19-16.pdf.pdf 05/01/2017
Design document FV Preliminary Design_Markup copy.pdf 10/25/2016
Design document Freindly Village Restoration Phase 2 Preliminary SHTS.pdf 10/25/2016
Design document 15-1059 Basis of Design Report.docx 10/25/2016
Design document Map of Sewer Lines in Project Area.pdf 07/14/2015
Final project report Final Report 06/14/2017.pdf 06/14/2017
Final project report Final Report, 15-1059 (accepted 06/12/17 15:35:21).pdf 06/12/2017
Land Ownership Certification Form FV Ph II Landowner Cert form.pdf 12/08/2015
Landowner acknowledgement form Landowner Ack_Phase II FV.pdf 03/24/2015
Map: Area of Potential Effect (APE) APE Map with topographic lines.pdf 08/13/2015
Map: Planning Area Map of Restoration Area.pdf 03/18/2015
Photo Foot Bridge low water.jpg 03/18/2015
Photo High Water Looking upstream from Foot Bridge.jpg 03/18/2015
Photo Bank Erosion .jpg 03/18/2015
Photo High Water Looking Upstream.jpg 03/18/2015
Photo Photo of Foot Bridge During High Water.jpg 03/18/2015
Photo High Water Lower Menader.jpg 03/18/2015
Progress report Progress Report 10/26/2016.pdf 10/26/2016
Progress report Progress Report 05/12/2016.pdf 05/12/2016
Project Application Report Application Report, 15-1059P (submitted 10/06/15 13:46:53).pdf 10/06/2015
Project Application Report Application Report, 15-1059P (submitted 08/27/15 10:33:06).pdf 08/27/2015
Project Application Report Application Report, 15-1059P (submitted 08/13/15 15:36:05).pdf 08/13/2015
Salmon Project Proposal Appendix_C_PlanningProject_Track_Changes.docx 08/27/2015
Visuals site visit 15-1059 April 2015.pptx 05/08/2015