PRISM Project #14-1739 (Completed)
Upper Peshastin Barrier Conceptual Design
    Project Details    
Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272777, Study Area for Passage Correction 03-22-16
Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739) 03/22/2016, Attachment #272777, Study Area for Passage Correction 03-22-16

Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272777, Study Area for Passage Correction 03-22-16 Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

Attachment #202079, 2012 Peshastin Upper Reaches 014Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

Attachment #202084, 2012 Peshastin Upper Reaches 013Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)
, Progress Report: 07/06/2015
02/25/2015, Attachment #229543, IMG_3813Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

10/19/2015, Attachment #269331, Upper Drop March 2016 to October 2015Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

10/19/2015, Attachment #269332, Downstream View MArch 2016 to October 2015Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

11/17/2015, Attachment #269333, 111715 Flood 2Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272769, US 97 Culvert Outlet 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272770, Upper Peshastin Passage Reach 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272771, US 97 Culvert Inlet 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272772, Ruby Slide to Creek 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272775, Slide Reach Needs Passage 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

Attachment #272776, Culvert Inlet 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272778, Ruby Slide 03-22-16Chelan Co Natural Resource; Upper Peshastin Barrier Conceptual Design (#14-1739)

03/22/2016, Attachment #272779, Culvert Inlet - Horizontal 03-22-16
Project Status:  Closed Completed since 05/22/2017
 
Project Type:  Planning
Project Sponsor:  Chelan County Natural Resources Department
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $58,157
Total RCO Grant: $58,157 (84%)
Sponsor Match: $11,166 (16%)
Total Agreement: $69,323 (100%)
              Links
 

    Project Description    
The project will assess the existing geologic conditions of the Ruby Slide, existing fish passage conditions to determine what is the limiting factor(s) for passage past this reach, develop conceptual designs for project alternatives, and to coordinate with stakeholders (USFS, WSDOT and WDFW) to evaluate and select a preferred alternative conceptual design.
Currently, a 1000’ reach of Peshastin Creek, (RM 10.4-10.6) is believed to be limiting access to spawning habitat upstream. Spawning distribution and timing data, as well as field observations, suggest that a landslide above the Ruby Creek confluence may be acting as a barrier at low flows, thus inhibiting access to high quality spawning areas and delaying the spawn timing of fish that eventually access habitat above the slide by over 40 days. The upper Peshastin Creek and tributaries above this reach provide diverse habitat types and substantial low gradient spawning habitat. Road building alteration to the channel has been exacerbated in this reach by the failure of the slope above the reach (The Ruby Slide), and WSDOT repairs to this stretch of US 97. The resulting channel is severely constricted between vertical gabion baskets and the toe of a 16 acre slide path. Spawning surveys conducted by WDFW throughout the Wenatchee basin from 2004 - 2010 demonstrate steelhead spawning in Peshastin Creek contributes significantly to the basin as a whole. In 2010, Peshastin Creek had 12.2% of the steelhead redds in the Wenatchee subbasin. The majority of the spawning is distributed in the lower Peshastin between RM 3 to 6.5. In the upper Peshastin steelhead show a pattern of concentrated spawning between Ingalls and Ruby Creek with dispersed spawning beyond the project site and in Tronsen Creek.

    Project Contacts    
         
Project Sponsor: Chelan County Natural Resources Department Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Pete Cruickshank
pete.cruickshank@co.chelan.wa.us
(509) 699-1754
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Upper Peshastin, along US 97
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Blewett
HUC8:   Wenatchee (17020011)
WRIA:   Wenatchee
Sections:   36
Township:   T23NR17E
Coordinates:   47.44855564
-120.65629627

    Worksites    
Worksite NameScope of WorkActual Planning Cost
Peshastin Creek RM 10.4-10.6 (#1) Preliminary design (B.1.b.11.a RCO) $79,020
 Total$79,020
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

      
Area Encompassed (acres) (B.0.b.1) 1.0
Miles of Stream and/or Shoreline Affected (B.0.b.2) 0.20

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/04/2014
Data Gathering Started 04/20/2015
RFP Complete/Consultant Hired 04/20/2015
Progress Report Due 06/30/2015
Special Conditions Met 07/24/2015 Provide geologic assessment report of Ruby Slide to SRFB Review Panel.
Annual Project Billing Due 07/31/2015
Special Conditions Met 08/24/2015 SRFB Review Panel approves or denies continuing with design process.
Progress Report Due 12/31/2015
Progress Report Due 06/30/2016
Annual Project Billing Due 07/31/2016
Special Conditions Met 08/31/2016 Letters of Support from the USFS and WSDOT for the preferred alternative.
Draft Design to RCO 02/01/2017 Draft Conceptual Design.
Agreement End Date 03/31/2017
Final Design to RCO 04/03/2017 Final Conceptual Design.
Final Report Due 06/30/2017
Final Billing Due 06/30/2017


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 14-1739 Project Agreement.pdf 03/31/2015
Amendment - State 14-1739 Amend #1 Time Extension.pdf 08/23/2016
Application Review Report Application Review Report, 14-1739P(compl 09/23/14 13:18:07).pdf 09/23/2014
Cost Estimate Peshastin Migration Barrier Cost Estimate.docx 08/13/2014
Design document Upper Peshastin Design Report - Final With Appendices.pdf.pdf 04/19/2017
Environmental Site Assessment Report Peshastin Creek Geologic Report.pdf.pdf 04/19/2017
Final project report Final Report 05/22/2017.pdf 05/22/2017
Final project report Final Report, 14-1739 (accepted 05/22/17 09:05:33).pdf 05/22/2017
Inspection Report Interim Inspection Photos 03-22-16.pptx 07/19/2016
Map: Planning Area PMB Access Map.pdf 07/06/2015
Map: Planning Area map planning area.pdf 08/13/2014
Photo Culvert Inlet - Horizontal 03-22-16.jpg 07/19/2016
Photo Ruby Slide 03-22-16.jpg 07/19/2016
Photo Study Area for Passage Correction 03-22-16.jpg 07/19/2016
Photo Culvert Inlet 03-22-16.jpg 07/19/2016
Photo Slide Reach Needs Passage 03-22-16.jpg 07/19/2016
Photo Ruby Slide to Creek 03-22-16.jpg 07/19/2016
Photo US 97 Culvert Inlet 03-22-16.jpg 07/19/2016
Photo Upper Peshastin Passage Reach 03-22-16.jpg 07/19/2016
Photo US 97 Culvert Outlet 03-22-16.jpg 07/19/2016
Photo 111715 Flood 2.jpg 06/28/2016
Photo Downstream View MArch 2016 to October 2015.jpg 06/28/2016
Photo Upper Drop March 2016 to October 2015.jpg 06/28/2016
Photo IMG_3813.jpg 07/06/2015
Photo 2012 Peshastin Upper Reaches 013.jpg 08/13/2014
Photo 2012 Peshastin Upper Reaches 014.jpg 08/13/2014
Progress report Progress Report 06/28/2016.pdf 06/28/2016
Progress report Progress Report 10/19/2015.pdf 10/19/2015
Progress report Progress Report 07/07/2015.pdf 07/07/2015
Project Application Report Application Report, 14-1739P (submitted 08/13/14 14:45:47).pdf 08/13/2014
Project Deliverables Peshastin Creek Geologic Report-FINAL.pdf 08/13/2015
Salmon Project Proposal Comment Form with Design Approach.pdf 10/16/2014
Salmon Project Proposal Upper Peshastin Migration Barrier Design_final-proposalwtrac.pdf 06/24/2014
Salmon Project Proposal Upper Peshastin Migration Barrier Design_final-proposalwotra.pdf 06/24/2014
Salmon Project Proposal Upper Peshas Design_pre-proposal.pdf 05/02/2014
SRFB Review Panel Comment Form 14-1739 Upper Peshastin Migration Barrier Design_.pdf 12/29/2014