Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #21-1106 (Other)
Bear Creek at Friendly Village (Ph III) Prelim Des
    Project Details    
Project Status:  Wastebasket since 04/09/2021
 
Project Type:  Planning
Project Sponsor:  Adopt A Stream Foundation
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $149,774
Total RCO Grant: $149,774 (100%)
Total Agreement: $149,774 (100%)
              Links
 

    Project Description    
Adopt a Stream Foundation will complete preliminary designs (per Manual 18 Appendix D-2) for the third and final Bear Creek Reach 6 stream restoration project at the Friendly Village Mobile Home Park in Redmond, WA.  Design will focus on improving habitat conditions for Chinook salmon with a special emphasis placed on juvenile rearing. The project will address habitat-limiting factors, including removing covered (pedestrian) bridge that confines the channel, installing Large Wood, re-vegetating approximately 2.5 acres of riparian buffer, increasing flood plain connectivity and re-establishing natural stream processes along approximately 1,055 feet of channel.Restoration designs  will directly address priorities for Bear/Cottage Lake Creeks in the WRIA 8 Conservation Strategy for Chinook salmon (threatened), including protecting and restoring riparian vegetation and floodplain connectivity. Restoration elements will be designed using the techniques and methods identified in the Integrated Stream Bank Protection Guidelines and the Stream Habitat Restoration Guidelines and other fisheries engineering restoration technology currently being used in the Puget Sound Basin. In 2020, AASF restored 345 feet of Bear Creek and 1.1 acres of riparian just downstream of this location. Once implemented, this  Ph III restoration project will connect stream restoration efforts up and downstream to provide over 5,230 feet of restored Chinook habitat.

    Project Contacts    
         
Project Sponsor: Adopt A Stream Foundation Lead Entity: Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
  Project Contact: Walter Rung
walterr@streamkeeper.org
(425) 316-8592 111
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
   

    Project Location    
County:   King
Legislative District:   48
Congressional District 2022:   01
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Sammamish River
HUC8:   Lake Washington (17110012)
WRIA:   Cedar - Sammamish
Sections:   06
Township:   T25NR06E
Coordinates:   47.68284792
-122.09218428

    Worksites    
Worksite NameScope of WorkProposed Planning Cost
Bear Creek Reach 6 (#1) Agency Indirect, Cultural resources, Preliminary design (B.1.b.11.a RCO) $149,774
 Total$149,774
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Bear Creek Reach 6 (#1)   Property 1 - Friendly Village Local Government
Bear Creek Reach 6 (#1)   Property 2 - Underground infrastructure (TBD) Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricEstimated

Restoration Metrics (rolled up from Worksite level)

      
Area Encompassed (acres) (B.0.b.1) 2.5
Miles of Stream and/or Shoreline Affected (B.0.b.2) 0.20

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Cultural Assessment [Section 106]
Nationwide Permit
Hydraulics Project Approval [HPA]
Other Required Permits
Dredge/Fill Permit [Section 10/404 or 404]

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Applicant Resolution/Authorizations FV PIII App Auth.pdf.pdf 02/12/2021
Application Review Report Grant Manager Comments, 21-1106P(rtnd 04/01/21 15:52).pdf 04/01/2021
Application Review Report Grant Manager Comments, 21-1106P(rtnd 03/01/21 09:53).pdf 03/01/2021
Cost Estimate Budget Sheet FVIII_Final.xlsx.xlsx 03/03/2021
Design document Veg map_rev1.pdf.pdf 03/18/2021
Design document Concept map.pdf.pdf 03/18/2021
Design document Chinook Redds map_right one.pdf.pdf 03/18/2021
Design document Map of Sewer Lines in Project Area.PDF.pdf 03/03/2021
Map: Area of Potential Effect (APE) APE FV Phase III.jpg.jpg 02/24/2021
Map: Planning Area Bear Creek Restoration Phase III.pdf.pdf 02/11/2021
Photo Image of Ph II after restoration.JPG.jpg 03/03/2021
Photo Jan-2021 Looking upstream from Ph II.JPG.jpg 02/24/2021
Photo Footbridge during high flowsJPG.jpg 02/24/2021
Project Application Report Project Application Report, 21-1106P (sub 04/09/21 11:25:28).pdf 04/09/2021
Project Application Report Project Application Report, 21-1106P (sub 03/03/21 13:44:29).pdf 03/03/2021
Project Application Report Project Application Report, 21-1106P (sub 02/17/21 14:39:07).pdf 02/17/2021
Project Review Comments Proj Review Comments LE, 21-1106P(compl 04/09/21 11:25).pdf 04/09/2021
Project Review Comments Proj Review Comments Initial, 21-1106P(compl 04/09/21 11:24).pdf 04/09/2021
Visuals Virtual Site Visit Presentation Friendly Phase III.pptx.pptx 03/18/2021

Back to top Date of last change: 04/11/2022