Project Snapshot
PRISM Project #15-1210 (Completed)
Upper White Pine Floodplain Reconnection
    Project Details    
Chelan Co Natural Resource; Upper White Pine Floodplain Reconnection (#15-1210)

Attachment #220038, IMG_0244
Chelan Co Natural Resource; Upper White Pine Floodplain Reconnection (#15-1210) Attachment #220038, IMG_0244

Chelan Co Natural Resource; Upper White Pine Floodplain Reconnection (#15-1210)

Attachment #220038, IMG_0244 Chelan Co Natural Resource; Upper White Pine Floodplain Reconnection (#15-1210)

Attachment #233292, CPUDPolesChelan Co Natural Resource; Upper White Pine Floodplain Reconnection (#15-1210)

Attachment #233294, Levee_RiverLeftChelan Co Natural Resource; Upper White Pine Floodplain Reconnection (#15-1210)

12/31/2016, Attachment #291498, UWP Drone_Flight
Project Status:  Closed Completed since 02/08/2019
 
Project Type:  Restoration
Project Sponsor:  Chelan County Natural Resources Department
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $747,767
Total RCO Grant: $747,767 (49%)
Sponsor Match: $777,678 (51%)
Total Agreement: $1,525,445 (100%)
              Links
 

    Project Description    
This section of Nason Creek was re-located in the late 1950's when the BNSF railroad was built in it's current location. From RM 13.3 to RM 13.8, Nason Creek flows east between two constructed levees that protect the CPUD powerlines to the north and the BNSF railroad to the south. There is no spawning for spring Chinook or steelhead within the project area, however, spawning is present just upstream and downstream of the project area. The existing bed is incised due to channelization and Nason Creek is disconnected from the adjacent 30 acre floodplain wetland to the north. This project will remove ~0.5 mile of the river left levee, re-locate ~1,400 linear feet of straightened mainstem into a new meander alignment, provide over eight acres of floodplain rearing habitat, and re-connect ~30 acres of channel migration zone. This project will re-locate the CPUD powerlines out of the floodplain to accommodate stream restoration actions. The primary goal of the project is to improve and increase salmonid habitat in 0.5 mile of Nason Creek to increase the abundance and productivity of ESA-listed UCR spring Chinook salmon and UCR steelhead. This project will address the #1 ecological concern per the Biological Strategy by enhancing peripheral and transitional habitats in the #1 priority area in the Wenatchee Basin. This project will also address the #2 ecological concern in Nason Creek by improving in-stream complexity through the addition of large wood (332 pieces).

    Project Contacts    
         
Project Sponsor: Chelan County Natural Resources Department Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Jennifer Hadersberger
jennifer@cdlandtrust.org
(509) 860-1022
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Upper Nason Creek, upstream of Coles Corner
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Upper Nason
HUC8:   Wenatchee (17020011)
WRIA:   Wenatchee
Sections:   05
Township:   T26NR16E
Coordinates:   47.78768261
-120.86621735

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Nason Creek Upper White Pine (#1) Channel reconfiguration and connectivity (C.4.c.1) $1,527,767
 Total$1,527,767
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Nason Creek Upper White Pine (#1)   Property 1 - Nason Creek Upper White Pine Federal Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Instream Habitat Project
      Channel reconfiguration and connectivity (C.4.c.1)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) 0.50
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) 27.0
Instream Pools Created/Added (C.4.c.6) 7

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/09/2015
Cultural Resources Complete 01/31/2016 NEPA too.
Landowner Agreement to RCO 07/31/2016
Progress Report Due 07/31/2016
Permits Complete 07/31/2016
Bid Awarded/Contractor Hired 07/31/2016 Phase 1 Tree Salvage
Preliminary Design to RCO 09/30/2016
Annual Project Billing Due 12/31/2016
Restoration Complete 12/31/2016 Phase 1 Tree Salvage Complete
Progress Report Due 12/31/2016
Final Design to RCO 02/28/2017 Stream Restoration, as described in RCO Manual #18, Appendix D-3.
Restoration Started 07/31/2017 Phase 2 Stream Restoration Channel Construction
Progress Report Due 07/31/2017
Restoration Complete 07/31/2017 Phase 1 Powerline Re-location
Annual Project Billing Due 12/31/2017
Progress Report Due 12/31/2017
Restoration Complete 12/31/2017 Phase 2 Stream Restortion Channel Construction
Final Design to RCO 12/31/2017 As-built Design for Phase 2 Restoration, as described in RCO Manual #18, Appendix D-4.
Progress Report Due 07/31/2018
RCO Final Inspection 10/29/2018
Agreement End Date 12/31/2018
Annual Project Billing Due 12/31/2018
Restoration Complete 12/31/2018 Phase 3 Levee Removal, Flow Diversion to New Channel and Mainstem Backfill
Final Report Due 03/31/2019
Final Billing Due 03/31/2019


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 15-1210 Project Agreement.pdf 03/07/2016
Amendment - State 15-1210 Amend #1 Cost Change.pdf 07/25/2017
Applicant Resolution/Authorizations Application Authorization 01-11-16.pdf 01/25/2016
Application Review Report Application Review Report, 15-1210R(compl 08/11/15 14:53:58).pdf 08/11/2015
Cost Estimate CostEstimate.pdf 08/11/2015
Cost Estimate UWPLineItemCostEstMemo_Final.pdf 06/19/2015
Design document Nason UWP Subreach 2 stamped plansreduced.pdf.pdf 08/03/2017
Design document Nason UWP Subreach 2 100% - Basis of Design Report (includin.pdf 08/03/2017
Design document 90% Design Drawings 06-07-16.pdf 07/26/2016
Design document UWP_Rest Plan_final_011513.pdf 04/15/2015
Design document CPUD-HDRFinalMemo.pdf 04/15/2015
Design document Nason60%DesignReport.pdf 04/15/2015
Design document Nason60%Drawings.pdf 04/15/2015
Final project report Final Report, 15-1210 (accepted 02/07/19 17:48:17).pdf 02/07/2019
Inspection Photos UWP Final Inspection Photos 10-29-18.pptx 11/09/2018
Inspection Report Inspection Report, #1542 (Accepted 11/09/18 08:02:14).pdf 11/09/2018
Map: Restoration Worksite UpperWhitePineRestorationWorksite.pdf 08/11/2015
Permit NEPA_FONSI.pdf 07/25/2016
Photo UWP Drone_Flight.tif 01/03/2017
Photo Levee_RiverLeft.jpg 08/11/2015
Photo CPUDPoles.jpg 08/11/2015
Photo IMG_0244.jpg 04/17/2015
Photo IMG_0797.jpg 04/15/2015
Progress report Progress Report, 15-1210 (accepted 07/12/18 16:09:14).pdf 07/12/2018
Progress report Progress Report, 15-1210 (accepted 01/02/18 11:22:53).pdf 01/02/2018
Progress report 2017_Construction_Status_Summary with photos.pdf 01/02/2018
Progress report Progress Report, 15-1210 (accepted 08/03/17 15:06:54).pdf 08/03/2017
Progress report Progress Report 01/03/2017.pdf 01/03/2017
Progress report Progress Report 07/29/2016.pdf 07/29/2016
Project Application Report Application Report, 15-1210R (submitted 08/11/15 12:14:59).pdf 08/11/2015
Salmon Project Proposal UWP_Final_Proposal_August2015.pdf 08/11/2015
SRFB Review Panel Comment Form SRFB Review Panel Final Comment Form.pdf 01/29/2016
SRFB Review Panel Comment Form Response_to_Comments.pdf 08/11/2015
Visuals PowerlinePhotosspring2017.pdf.pdf 08/03/2017
Visuals 5-25-17flows1560cfs.pdf.pdf 08/03/2017