| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Instream Habitat Project |
Channel structure placement (C.4.d.1) |
|
Miles of Stream Treated for channel structure placement (C.4.d.3)
|
0.10
|
|
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
|
0.1
|
|
Pools Created through channel structure placement (C.4.d.5)
|
3
|
|
Number of structures placed in channel (C.4.d.7)
|
3
|
Riparian Habitat Project |
Planting (C.5.c.1) |
|
Acres Planted in riparian (C.5.c.3)
|
0.1
|
Estuarine / Nearshore Project |
Channel modification (C.9.c.1) |
|
Acres of Estuary Treated (C.9.c.3)
|
0.5
|
Dike Or berm modification / removal (C.9.d.1) |
|
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
|
0.5
|
Culvert modification / removal (C.9.f.1) |
|
Number of Culverts Modified/Removed To Allow Fish Passage (C.9.f.2)
|
1
|
|
Acres Opened To Fish Passage through culvert modification/removal (C.9.f.3)
|
0.5
|
Regrading of slope (C.9.i.1) |
|
Acres of Estuary Treated through slope regrading (C.9.i.2)
|
0.5
|
Estuarine plant removal / control (C.9.j.1) |
|
Acres of Estuary Treated for plant removal/control (C.9.j.3)
|
0.2
|
Shoreline armor removal or modification (C.9.k.1) |
|
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
|
0.05
|
|
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
|
0.1
|