Skinney Creek Culvert Replacement Proj
|
Chelan Co Natural Resource; Skinney Creek Culvert Replacement Proj (#05-1509)
09/08/2005, Attachment #18867, Upper_Skinney_US_pond2
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
The Chelan County Natural Resources Department (CCNRD) will implement the Skinney Creek Culvert Replacement Project to correct a problem culvert and reduce blockages that interrupt adult and juvenile salmonid migrations. This project was identified as part of a Chelan County Fish Barrier Inventory Study completed by the Harza/BioAnalyst Engineering Co. in 2000. The culvert on Skinney Creek is a substantial barrier to fish due to the presence of a high outfall drop distance and high velocities. The replacement of this culvert will directly address a physical barrier that interferes with salmonid passage to spawning and rearing habitat.
Skinney Creek is a tributary of Chiwaukum Creek and is one of the watersheds that makeup the Wenatchee subbasin in North-central Washington. Chiwaukum Creek, the parent creek of Skinney Creek, has a known occurrence of endangered spring Chinook/ Summer steelhead and threatened bull trout. Adult steelhead were documented in Skinney Creek 10 years ago by USFS fisheries biologist Dan Rife and on a recent site visit the Chelan County natural resources specialist located juvenile steelhead/rainbow in a pool immediately above the culvert. Due to the occurrence of endangered and potentially threatened species in Chiwaukum Creek and the historical presence of steelhead in Skinney Creek, it is a high priority to replace the Skinney Creek culvert at this time.
|
General Area:
|
|
Skinney Creek
|
Waterbody:
|
|
Chiwaukum Creek, Skinney Creek
|
County:
|
|
Chelan
|
Legislative District:
|
|
12
|
Congressional District 2022:
|
|
08
|
Salmon Recovery Regions:
|
|
Upper Columbia River
|
Watershed Administrative Unit:
|
|
Chiwaukum
|
HUC8:
|
|
Wenatchee (17020011)
|
WRIA:
|
|
Wenatchee
|
Sections:
|
|
20
|
Township:
|
|
T26NR17E
|
Coordinates:
|
|
47.73028558 -120.74008786
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Skinney Creek Culvert Replace (#1)
|
Architectural & Engineering (A&E), Bridge installed or improved (C.2.g.1), Fish passage blockages removed or altered (C.2.c.1), Fishway chutes or pools installed (C.2.d.1), Restoration signs, Traffic control, Utility relocation / reconnection
|
$75,991
|
| Total | $75,991 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Skinney Creek Culvert Replace (#1)
|
|
Property 1 - Property - Worksite #1
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Passage Improvement |
Fish passage blockages removed or altered (C.2.c.1) |
|
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
|
1
|
Bridge installed or improved (C.2.g.1) |
|
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
|
3.00
|
|
Number of bridges (C.2.g.2)
|
1
|
|
|
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
|
1
|
Milestone Name | Target Date | Description |
Project Start
|
03/01/2006
|
Begin permit application
|
RFP Complete
|
03/01/2006
|
Schedule surveying-design
|
Applied for Permits
|
03/15/2006
|
Submit JARPA
|
A&E Plans Submitted
|
06/01/2006
|
Bridge and stream channel design
|
Bid Awarded/Consultant Hired
|
07/01/2006
|
Award construction contract
|
Construction Started
|
08/01/2006
|
Conduct pre-con
|
Proposed Completion Date
|
09/15/2006
|
All bridge and stream work
|
Construction Complete
|
10/01/2006
|
All re-vegetation
|
Agreement End Date
|
11/30/2007
|
Close any remaining items
|
Final Docs/Billing to Mgmt Agy
|
12/30/2007
|
Submit final project report
|