Project Snapshot
PRISM Project #04-1509 (Completed)
Peshastin Creek Fish Barrier Removal
    Project Details    
Chelan County of; Peshastin Creek Fish Barrier Removal (#04-1509)

06/01/2004, Attachment #10280, Peshastin Dam 2
Chelan County of; Peshastin Creek Fish Barrier Removal (#04-1509) 06/01/2004, Attachment #10280, Peshastin Dam 2

Chelan County of; Peshastin Creek Fish Barrier Removal (#04-1509)

06/01/2004, Attachment #10280, Peshastin Dam 2 Chelan County of; Peshastin Creek Fish Barrier Removal (#04-1509)

06/01/2004, Attachment #10279, Peshastin Dam 1Chelan County of; Peshastin Creek Fish Barrier Removal (#04-1509)

04/18/2007, Attachment #45080, Peshastin roughened channel- April 18 07Chelan County of; Peshastin Creek Fish Barrier Removal (#04-1509)

Attachment #45082, 04-1509 Peshastin Creek Fish Barrier Removal PHOTO
Project Status:  Closed Completed since 05/04/2007
 
Project Type:  Restoration
Project Sponsor:  Chelan County
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $83,041
Total RCO Grant: $83,041 (35%)
Sponsor Match: $154,910 (65%)
Total Agreement: $237,950 (100%)
              Links
 

    Project Description    
This project would build a fish passage structure at the Peshastin Irrigation District diversion structure on lower Peshastin Creek. The structure will allow access to spawning and rearing habitat for steelhead, bull trout and spring Chinook. The project would locate a roughened channel fishway at a channel slope of 3.9% upstream from the dam axis on the left abutment. Project also includes installation of fish screen at head gates. The dam would be notched for a 16ft width. From that notch the roughened channel fishway would extend upstream for approximately 87 feet. The fishway would have two training walls for the entire length. The walls would extend to elevation 1180 (same as the left abutment elevation) and be constructed of steel plate sections with rock support. The channel would be trapezoidal in cross section with 2:1 side slopes and 3ft bottom width. Boulders would be placed in the fishway invert to create a meandering flow pattern and provide shelter for fish. Two boulder weirs would be placed immediately downstream from the fishway exit to backwater flashboard weirs at the channel's upstream exit. These weirs are required to meet hydraulic drop criteria of 6 inches. The upstream exit would be controlled by 8 flashboard bays. Incidental creek channel reshaping will be required to connect the fishway invert to the existing thalweg up and downstream. The existing dam notch would be closed when the fishway is in use.

    Project Contacts    
         
Project Sponsor: Chelan County Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Michael Kaputa
mike.kaputa@co.chelan.wa.us
(509) 670-6935
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   From the intersection of Highway 2 and Highway 97, head southbound on Highway 97. The project is located on the east side of the road approximately 4 miles.
Waterbody:   Peshastin Creek, Peshastin Irrigation District, Wenatchee River
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Mt Stuart
HUC8:   Wenatchee (17020011)
WRIA:   Wenatchee
Sections:   29
Township:   T24NR18E
Coordinates:   47.54342751
-120.61283649

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Peshastin Creek Fish Barrier Removal (#1) Architectural & Engineering (A&E), Fish passage blockages removed or altered (C.2.c.1), Fishway chutes or pools installed (C.2.d.1) $237,950
 Total$237,950
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Peshastin Creek Fish Barrier Removal (#1)   Property 1 - Property - Worksite #1 Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Fish passage blockages removed or altered (C.2.c.1)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) 1
      Fishway chutes or pools installed (C.2.d.1)
Number Of Fishway Chutes/Pools Installed (C.2.d.2) 1
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 02/01/2005
Applied for Permits 02/01/2005
Construction Started 08/01/2005
Construction Complete 12/31/2005
Agreement End Date 10/31/2006 WDFW is requiring a small amount of remedial work yet
Final Docs/Billing to Mgmt Agy 12/31/2006


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 04-1509 Agreement 6 pgs..pdf 03/15/2008
Application authorization 04-1509 Peshastin Authorization.pdf 06/04/2004
Application Document 04-1509 Fish Passage Evaluation form.pdf 08/30/2004
Design document 04-1509 Peshastin Crk Diversion Project Roughened Channel.jpg 06/15/2004
Design document 04-1509 Pesh Crk Div Rough Chan Fishway PRELIMINARY.jpg 06/15/2004
Evaluation proposal 04-1509 Peshastin evaluation proposal.pdf 07/13/2004
Final project report 04-1509 Peshastin Final Report February 23, 2007.pdf 04/13/2007
Historical - Restoration Documents 04-1509 WDFW Review of Peshastin project.pdf 03/22/2006
Inspection Photos Chelan April 18-19 024.jpg 05/22/2007
Inspection Photos Peshastin roughened channel.jpg 05/22/2007
Inspection Photos Peshastin roughened channel- April 18 07.jpg 05/22/2007
Landowner acknowledgement form 04-1509 Peshastin landowner willingness form.jpg 07/13/2004
Map: Restoration Worksite 04-1509 SRFB Peshastin Crk Diversion.jpg 06/04/2004
News Article 04-1509 Peshastin Creek Fish Barrier Removal PHOTO.jpg 05/22/2007
News Article 04-1509 Peshastin Creek bypass.pdf 02/15/2006
Photo Peshastin Dam 2.jpg 07/23/2004
Photo Peshastin Dam 1.jpg 07/23/2004
Photo looking upstream from pumphouse.jpg 07/23/2004
Photo looking upstream at side channel.jpg 07/23/2004
Photo looking upstream at current diversion.jpg 07/23/2004
Photo looking downstream at forebay structure.jpg 07/23/2004
SRFB Review Panel Comment Form 04-1509 SRFB Comment Form.pdf 07/28/2015