    Project Details    
Project Status:  Not Implemented since 05/11/2007
Planned Completion:  12/30/2007
Project Type:  Restoration
Project Sponsor:  Chelan County Natural Resources Department
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $402,642
Total RCO Grant: $402,642 (85%)
Sponsor Match: $72,000 (15%)
Total Agreement: $474,642 (100%)
              Links
 

    Project Description    
This proposal represents Phase II (Construction) of the Nason Creek Oxbow Reconnection Project. Completion of the Nason Creek Oxbow Project will reconnect partial flows and full fish access to 4,600 linear feet of oxbow habitat (34.5 acres) to the mainstem Nason Creek. This will provide off-channel rearing and foraging habitat for ESA-listed spring chinook salmon, summer steelhead, and bull trout. This project directly addresses the primary habitat limiting factors in Nason Creek, and has been identified and prioritized through the Wenatchee River CMZ Study; a SRFB-funded project.



Phase I of the Nason Creek Oxbow Project (funded by a 2005 SRFB grant) evaluated oxbow reconnection alternatives. Through this analysis, the preferred alternative is to install two 12' diameter culverts under SR 207 to reconnect partial flows and year-round fish access to the oxbow. This alternative was found to be the most cost effective and lowest risk alternative that achieves the goal of reconnecting fish access to the oxbow habitat. Using existing 2005 SRFB funds, the CCNRD will complete 100% design plans for the preferred alternative in the summer of 2006. As the project will require construction in SR 207, the CCNRD has worked closely with WSDOT to ensure that the project will meet WSDOT's design, maintenance, and safety standards. Funding for this Phase II will be used to complete final design review, permitting, the installation of the two culverts per WSDOT-approved plans, and monitoring.

    Project Contacts    
         
Project Sponsor: Chelan County Natural Resources Department Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
 

   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Nason Creek, a tributary to Wenatchee Lake.
Waterbody:   Nason Creek, Wenatchee River
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Lower Nason
HUC8:   Wenatchee (17020011)
WRIA:   Wenatchee
Sections:   09
Township:   T26NR17E
Coordinates:   47.77125788
-120.72032634

    Worksites    
Worksite NameScope of WorkProposed Restoration Cost
Nason Creek Oxbow Reconnection Project (#1) Architectural & Engineering (A&E), Artificial wetland created (C.8.f.1), Channel reconfiguration and connectivity (C.4.c.1), Channel structure placement (C.4.d.1), Fish passage blockages removed or altered (C.2.c.1), Obtain permits, Planting (C.5.c.1), Streambank stabilization (C.4.e.1), Wetland plant removal / control (C.8.d.1) $61,919
 Total$61,919
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Nason Creek Oxbow Reconnection Project (#1)   Property 1 - Property - Worksite #1 Federal Government
   Total
Amounts may not be complete

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Clear & Grade Permit
Cultural Assessment [Section 106]
Dredge/Fill Permit [Section 10/404 or 404]
Endangered Species Act Compliance [ESA]
Hydraulics Project Approval [HPA]
Shoreline Permit
Water Quality Certification [Section 401]

    Project Milestones    
Milestone NameTarget DateDescription
Applied for Permits 11/30/2006
Project Start 12/20/2006
Annual Project Billing Due 07/15/2007 Annual billing required by July 15th of each year of the project
Bid Awarded/Consultant Hired 07/31/2007 Construction contract awarded
Construction Started 08/15/2007
Construction Complete 10/30/2007
Agreement End Date 12/30/2007
Final Docs/Billing to Mgmt Agy 01/30/2008

NOTE: This data is subject to change.

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Application authorization Chelan County Nason Crk Auth Memo.pdf 10/10/2006
Correspondence Fish Passage Review Eval-Nason.pdf 10/04/2006
Design document Nelson 20% Design Report 2.pdf 09/20/2006
Evaluation proposal Chelan County_Nason_Evaluation ProposalQ14.pdf 09/18/2006
Evaluation proposal Chelan County_Nason_citations.pdf 09/18/2006
Landowner acknowledgement form Chelan County_Nason Landowner Form.pdf 09/18/2006
Map Chelan County_Nason_Project Vicinity Map.pdf 09/18/2006

Back to top Date of last change: 02/05/2024